CivilEA.com
  • Subscribe !
  • Register
  • Login
  • Home
  • Members
  • Help
  • Search
Civil Engineering Association eBooks Structural Books Bridge (Project and Technology) Risk-Based Management Guidelines for Scour at Bridges with Unknown Foundations

Risk-Based Management Guidelines for Scour at Bridges with Unknown Foundations
 mahyarov

Not-Activated

Iran
User ID: 1197
Joined: Apr 2009
Posts: 530
Threads: 451
Likes: 3,226 in 534 posts
Given Likes: 1492
Points:47,728 EP
#1
10-25-2012, 04:07 PM
Risk-Based Management Guidelines for Scour at Bridges with Unknown Foundations

Author: Stein, Stuart | Size: 2.50 MB | Format: PDF | Quality: Original preprint | Publisher: Transportation Research Board | Year: 2006 | pages: 458 | ISBN: -

[Image: 96240259610761509955.png]


[Image: info.png]

The US currently has over 60,000 bridges over water with unknown foundations. This report presents a risk-based approach to managing these bridges in the absence of foundation information. The general framework in this report, which is primarily applied to scour failure, can easily be applied to other hazards such as earthquakes and tsunamis. The guidelines illustrate how to collect appropriate data, estimate risk of failure from an estimated failure probability and associated economic losses, and use risk in a structured approach to select an appropriate management plan. Risk analysis is specifically used to select appropriate performance standards for various bridge classifications and justify the costs of nondestructive testing of foundations, monitoring activities, and countermeasures. The scour guidelines were applied to sixty case studies in the US to validate the management plan that was selected for bridges with known foundations, and to illustrate the specific application of the guidelines in a variety of settings.

[Image: download.png]
Code:
***************************************
Content of this section is hidden, You must be registered and activate your account to see this content. See this link to read how you can remove this limitation:

http://forum.civilea.com/thread-27464.html
***************************************


This post has been made by CivilEA Post-Generator ver 2.1.6



[-] The following 4 users Like mahyarov's post:4 users Like mahyarov's post
  • blaze, kowheng, cace-01, oanm2000
« Next Oldest | Next Newest »

Users browsing this thread: 1 Guest(s)



Possibly Related Threads…
Thread Author Replies Views Last Post
  Historic Bridges: Evaluation, Preservation, and Management struceng 4 1,926 08-09-2013, 02:57 PM
Last Post: axcel
  IABSE: Foundations for Major Bridges: Design and Construction lamkin 2 3,029 07-30-2013, 09:07 AM
Last Post: Jackass
  Approach for Establishing Approximate Load Carrying Capacity for Bridges with Unknown mahyarov 0 824 11-10-2012, 01:51 PM
Last Post: mahyarov
  Evaluating Scour at Bridges, Fifth Edition mahyarov 0 758 10-29-2012, 06:35 AM
Last Post: mahyarov
  Inspection and Management of Bridges with Fracture-Critical Details mahyarov 1 887 10-28-2012, 11:04 AM
Last Post: david-smith
  Monitoring Scour Critical Bridges mahyarov 0 676 10-25-2012, 08:47 PM
Last Post: mahyarov
  Scour at Contracted Bridges mahyarov 0 722 10-25-2012, 06:09 PM
Last Post: mahyarov

  • View a Printable Version
  • Subscribe to this thread

Designed by CivilEA - Powered by MyBB

Linear Mode
Threaded Mode