CivilEA.com
  • Subscribe !
  • Register
  • Login
  • Home
  • Members
  • Help
  • Search
Civil Engineering Association eBooks Structural Books Bridge (Project and Technology) BRIDGE CONSTRUCTION PRACTICES USING INCREMENTAL LAUNCHING

BRIDGE CONSTRUCTION PRACTICES USING INCREMENTAL LAUNCHING
 mowafi3m

Professional Member

Registered
Egypt
User ID: 1236
Joined: Apr 2009
Posts: 729
Threads: 383
Likes: 9,289 in 667 posts
Given Likes: 1660
Points:54,948 EP
#1
02-21-2011, 08:45 PM
BRIDGE CONSTRUCTION PRACTICES USING INCREMENTAL LAUNCHING

[Image: 30738806374406484917.jpg]

[Image: info.png]
SUMMARY
Bridge construction over deep valleys, water crossings with steep slopes or environmentally protected regions offer many challenges to owners, designers and contractors. The incremental launching method (ILM) for bridge construction may offer advantages over conventional construction, including creating minimal disturbance to surroundings, providing a more concentrated work area for superstructure assembly, and possibly increased worker safety given the improved erection environment. The ILM involves assembly of the bridge superstructure on one side of an obstacle to be crossed, and then movement (or launching) of the superstructure longitudinally into its final position.
Despite potential advantages for certain situations, usage of the ILM for bridge construction has been very limited in the United States. In recognition of this fact, the AASHTO Highway Subcommittee on Bridge and Structures commissioned a study to investigate potential reasons for the lack of application of this construction method. The work summarized in this paper presents the results of this investigation including applications, limitations and benefits of this innovative construction method.

[Image: Download.png]

Code:
***************************************
Content of this section is hidden, You must be registered and activate your account to see this content. See this link to read how you can remove this limitation:

http://forum.civilea.com/thread-27464.html
***************************************
523 kB, 14 pages



[-] The following 15 users Like mowafi3m's post:15 users Like mowafi3m's post
  • bhawk0, Dell_Brett, cesar3226, Adam Smith, melkat, usman, oanm2000, malc, dbsimon29, sujups, almadar12, zrilek, tremonti, phamtanvinh, blaze
« Next Oldest | Next Newest »

Users browsing this thread: 1 Guest(s)



Possibly Related Threads…
Thread Author Replies Views Last Post
  Accelerated bridge construction : best practices and techniques cace-01 1 1,160 02-26-2016, 05:34 PM
Last Post: taifur
  Bridge Launching Grunf 6 3,948 12-12-2015, 02:41 PM
Last Post: gianniorlati
  Construction Practices Handbook for Concrete Segmental and Cable-Supported Bridges RyanRS 1 1,763 05-11-2015, 06:35 AM
Last Post: PinkPant
  Best Practices in Bridge Management Decision-Making arshiakh 2 1,095 02-08-2015, 04:59 AM
Last Post: Veggeta
  Steel Bridge Erection Practices mahyarov 0 754 10-27-2012, 06:25 AM
Last Post: mahyarov
  BRIDGE CONSTRUCTION mowafi3m 0 1,437 06-06-2011, 08:38 AM
Last Post: mowafi3m

  • View a Printable Version
  • Subscribe to this thread

Designed by CivilEA - Powered by MyBB

Linear Mode
Threaded Mode