CivilEA.com
  • Subscribe !
  • Register
  • Login
  • Home
  • Members
  • Help
  • Search
Civil Engineering Association Portal

Welcome, Guest
You have to register before you can post on our site.

Username
  

Password
  





Search Forums

(Advanced Search)

Forum Statistics
» Members: 133,970
» Latest member: VBMMACHINERY
» Forum threads: 31,903
» Forum posts: 105,748

Full Statistics

Latest Threads
Engineering Guide for Woo...
Forum: Books and Codes Request
Last Post: toddyi
08-22-2026, 09:47 AM
» Replies: 0
» Views: 122
Future Homes Domestic Arc...
Forum: Own-Copyrighted Material
Last Post: Mattew
08-17-2026, 08:51 PM
» Replies: 0
» Views: 136
ACI Collection of Codes, ...
Forum: Own-Copyrighted Material
Last Post: poolmand
08-09-2026, 12:50 PM
» Replies: 4
» Views: 45,900
ASCE Paper (Ultimate Capa...
Forum: Theses, Journals and Papers Request
Last Post: civilfafa
07-27-2026, 06:34 AM
» Replies: 0
» Views: 294
ESDU 21004: The Statistic...
Forum: Theses, Journals and Papers Request
Last Post: civilfafa
07-25-2026, 01:20 AM
» Replies: 0
» Views: 278
ACI 303: Cast-in-Place Ar...
Forum: ACI
Last Post: Administrator
07-21-2026, 10:11 AM
» Replies: 0
» Views: 273
ACI 231.1: Managing and I...
Forum: ACI
Last Post: Administrator
07-21-2026, 09:35 AM
» Replies: 0
» Views: 220
ACI 308: Curing of Concre...
Forum: ACI
Last Post: Administrator
07-21-2026, 09:30 AM
» Replies: 0
» Views: 257
From War and Internet Bla...
Forum: CivilEA News
Last Post: jacky899
07-21-2026, 03:42 AM
» Replies: 27
» Views: 2,148
Original CSI license bein...
Forum: Csi Products
Last Post: Bhawk
07-14-2026, 03:31 PM
» Replies: 0
» Views: 303

 
  PILE ANALYSIS TIPS IN ETABS
Posted by: falconado - 09-16-2010, 09:52 PM - Forum: Calculation Notes & Analysis Files - No Replies

[/b]

DEAR FRIENDS,

THIS IS MY WAY, PILE SOLUTION WITH ETABS

There are two stages in the design of piles.

The first stage:
necessary to make proper placement of the pile. because I need to see that all the piles load. determined that during the spring instead of the lower ends to define a simple support is required. At this point in work to identify support required. otherwise the analysis to the structure because of stability problems are likely to be false. If you grasp this point better.Definition of ground to make at this stage is not important. target properly distribute the loads on piles.

The second stage:
After placement of piling poles 1 m Search for the spring constants are defined with the horizontal directions. the vertical direction, the maximum displacement of the lower end of the target in mind (for example, 25 mm for high buildings. may.) geotechnical engineer to receive the maximum stiffness of pile capacities need to assign. If you have, if the capacity of 500 tons of piles of 500 tons / 0,025 m = 20,000 tons / m is the spring constant. only in base vertical spring coeff. The result is a single point only to the vertical control of our calculations will prevent mistakes . vertical control of the account as a result of our mistakes in front of just a single point will do.

together with the analysis of the structure can no longer pile. layout and design of reinforced concrete and reinforcement stress neticesindeki elections are held.


best regards

falconado_turkey

Print this item

  Ram Concept users
Posted by: deadlord - 09-16-2010, 07:11 PM - Forum: Archive Problem - Replies (13)

Hi everyone,
I'd like to ask Ram Concept users about how should I draw the perimeter beams of a slab that's Curved, without having errors in Meshing like "operation stopped at (X,Y)" and when You look at the finite element mesh at some places parts of the beams are Gone,what is the problem In this Case.

Regards,
Husam.


Print this item

  ASTM - User's Guide to ASTM Specification C94 on Ready-Mixed Concrete
Posted by: ibg0203 - 09-16-2010, 05:56 PM - Forum: ASTM - Replies (1)

User's Guide to ASTM Specification C94
on
Ready-Mixed Concrete

[Image: 17924309670173195705.jpg]

User's Guide to ASTM Specification C94 on Ready-Mixed Concrete (ASTM Manual) (Astm Manual Series, Mnl 49)
By D. Gene Daniel; Colin L. Lobo

Publisher: ASTM International
Number Of Pages: 130
Publication Date: 2005-01-01
ISBN-10 / ASIN: 0803133634
ISBN-13 / EAN: 9780803133631

Product Description:
ASTM C 94 covers the complex subject of ready-mixed concrete. This manual, co-published by ASTM International and the National Ready-Mixed Concrete Association, provides a complete and detailed explanation of C 94's uses and applications. It cuts through the broad language of the standard by using straightforward explanations and examples. Twenty comprehensive chapters plus an overview cover: • Background of ASTM C 94/C 94M • Scope • Referenced Documents • Basis of Purchase • Ordering Information • Materials • Tolerances in Slump • Air-Entrained Concrete • Measuring Materials • Batching Plant • Mixers and Agitators • Mixing and Delivery • Uses of Nonagitating Equipment • Batch Ticket Information • Plant Inspection • Practices, Test Methods, and Reporting • Sampling and Testing Fresh Concrete • Failure to Meet Strength Requirements • Keywords • Annex of Mandatory Information

Contents
Preface
Introduction
Chapter 1--Scope
Chapter 2--Referenced Documents
Chapter 3--Basis of Purchase
Chapter 4reOrdering Information
Chapter 5--Materials
Chapter 6--Tolerances in Slump
Chapter 7--Air-Entrained Concrete
Chapter 8--Measuring Materials
Chapter 9--Batching Plant
Chapter 10mMixers and Agitators
Chapter 11 ~Mixing and Delivery
Chapter 12--Use of Nonagitating Equipment
Chapter 13~Batch Ticket Information
Chapter 14--Plant Inspection
Chapter 15--Practices, Test Methods, and Reporting
Chapter 16~Sampling and Testing Fresh Concrete
Chapter 17~Strength
Chapter 18--Failure to Meet Strength Requirements
Chapter 19~Keywords
Chapter 20~Annex (Mandatory Information)
References
Appendix--ASTM C 94-35

[Image: Download.png]
Code:
*************************************** Content of this section is hidden, You must be registered and activate your account to see this content. See this link to read how you can remove this limitation: http://forum.civilea.com/thread-27464.html ***************************************

[Image: password.png]
password for ifile link only, other links none
Code:
*************************************** Content of this section is hidden, You must be registered and activate your account to see this content. See this link to read how you can remove this limitation: http://forum.civilea.com/thread-27464.html ***************************************

Print this item

  CEB-FIP Model Code 2010 - First complete draft, FIB B55, B56
Posted by: ziggywas1 - 09-16-2010, 05:17 PM - Forum: Codes, Manual & Handbook - Replies (7)

FIP Model Code 2010 - First complete draft - Bulletins 55 & 56

[Image: 47872081794199101409.jpg]

[Image: info.png]
fib Bulletin No. 55 & 56
Title: Model Code 2010 - First complete draft, Volumes 1 & 2
Category: Draft model code
Year: 2010
Pages: 318 & 312
Format approx. DIN A4 (210x297 mm)
ISBN: 978-2-88394-095-6 & 978-2-88394-096-3

The Model Code for Concrete Structures is intended to serve as a basis for future codes. It takes into account new developments with respect to concrete structures, the structural material concrete and new ideas for the requirements to be formulated for structures in order to achieve optimum behaviour according to new insights and ideas. It is also intended as a source of information for updating existing codes or developing new codes for concrete structures. At the same time, the Model Code is intended as an operational document for normal design situations and structures.

This edition of the Model Code gives an extensive state-of-the-art regarding material properties for structural concrete. This includes constitutive relations for concrete up to strength class C120, and properties of reinforcing and prestressing steel, including prestressing systems. Special attention is given to the application of fibre concrete for structural applications, the application of non-metallic reinforcement, interface characteristics, verification assisted by numerical simulations, verification assisted by testing, and to a number of important construction aspects.

The Model Code 2010 is more 'life cycle' oriented than its predecessors. Reliability plays an important part: various methods are offered to cope with this aspect. The design of concrete structures is described for a large number of conditions. Design criteria are given with relation to reliability, functionality, durability and sustainability, where the last category is in the state of development. The chapter on conservation of structures provides insights into the degradation of concrete as a function of various types of environmental conditions. Attention is given to non-traditional types of reinforcement as well, like steel fibres and FRP, which have reached a status of recognition in the previous years.

Design rules for serviceability and ultimate limit states are given for a wide range of conditions, such as static and non-static loading (fatigue, impact and explosion, earthquake), high and low temperatures (fire and cryogenic). Furthermore limit states for durability are given. Design for sustainability will be an important task in the future; here some initial ideas are given. Design for robustness is also given due attention.

This document is the first complete draft of the fib Model Code 2010, and as such, it is open to suggestions for improvement. After comments and feedback have been received from the fib Commissions and duly taken into consideration, the final document will be submitted to the fib General Assembly for approval and then publication as the final version of the fib Model Code 2010.

[Image: screen.png]
[Image: 51204902442449525889.jpg]
[Image: 60256236555627981082.jpg]

[Image: Download.png]

Code:
*************************************** Content of this section is hidden, You must be registered and activate your account to see this content. See this link to read how you can remove this limitation: http://forum.civilea.com/thread-27464.html ***************************************

[Image: password.png]

Code:
*************************************** Content of this section is hidden, You must be registered and activate your account to see this content. See this link to read how you can remove this limitation: http://forum.civilea.com/thread-27464.html ***************************************

Print this item

  RECENT ADVANCES IN GROUND ANCHOR
Posted by: tuanpecc1 - 09-16-2010, 03:41 PM - Forum: Foundation & Geotechnics in general - Replies (2)

RECENT ADVANCES IN GROUND ANCHOR

[Image: screen.png]
[Image: 56768194741701235406.png]

[Image: info.png]
ABSTRACT
The recent advances in ground anchor technology and the related techniques of cable bolting and rock bolting are reviewed. Collectively the technology associated with the three techniques enable design engineers to address stability problems over a range of scales and in a range of geomechanical environments.
The techniques have similar aims but have developed into separate disciplines with unique attributes. The procedures for designing and creating ground anchors that meet the stringent requirements associated with modern civil infrastructure are discussed. This contrasts the very different design approaches being developed in rock bolting and cable bolting where standards are less exacting but the design problems can sometimes be more complex.

[Image: Download.png]

Code:
*************************************** Content of this section is hidden, You must be registered and activate your account to see this content. See this link to read how you can remove this limitation: http://forum.civilea.com/thread-27464.html ***************************************

[Image: password.png]

Code:
*************************************** Content of this section is hidden, You must be registered and activate your account to see this content. See this link to read how you can remove this limitation: http://forum.civilea.com/thread-27464.html ***************************************

Print this item

  Soil Liquefaction During Earthquakes
Posted by: giguni - 09-16-2010, 03:27 PM - Forum: Archive - Replies (2)

Soil Liquefaction During Earthquakes
Authors: Idriss, Boulanger
Publisher: Earthquake Engineering Research Institute (September 8, 2008)
Language: English
ISBN-10: 193288436X
ISBN-13: 978-1932884364

Thanks

Print this item

  "Floating Structure A Guide for Design and Analysis", N.D.P. Barltrop - CMPT
Posted by: t4m4_henry - 09-16-2010, 01:20 PM - Forum: Archive - Replies (2)

Hello,

I'm looking for a book with title on the subject. Please feel free for share it. Thanks before.

Print this item

  How to introduce P delta effect in Robot Structural Analysis Professional Ver. 2010
Posted by: uev_482 - 09-16-2010, 12:45 PM - Forum: Archive Problem - Replies (1)

Hello everybody,

I'm studying to use Robot Structural Analysis Professional ver. 2010. My problem is how to introduce P-delta effect in the analysis. It's very different with ETABS and SAP, which gives you a feeling that something is wrong with the result when you're using robot. Anybody has analysis reference manual for Robot Structural Analysis Profession ver. 2010? It's very hard to study a software without the analysis reference manual. Pls. help. thanks.

Print this item

  Transformer Pad DWG file
Posted by: RedHorse - 09-16-2010, 11:58 AM - Forum: Autocad Structural Details - No Replies

TransformerPad dwg files

[Image: info.png]
old office files,

project: power transformer upgrading

drawing files

1. E-30.dwg (architectural plan)
2. E-31.dwg (structural plan)

Transformer_pad.txt (structural input file)

notes:

work-around on modelling strap footing (my personal method)


[Image: screen.png]
[Image: 03815819065246489382.jpg]
[Image: 39156228028502191157.jpg][Image: 13295853176998988401.jpg][Image: 30072125721936367308.jpg]

[Image: Download.png]

Code:
*************************************** Content of this section is hidden, You must be registered and activate your account to see this content. See this link to read how you can remove this limitation: http://forum.civilea.com/thread-27464.html ***************************************

[Image: password.png]

Code:
*************************************** Content of this section is hidden, You must be registered and activate your account to see this content. See this link to read how you can remove this limitation: http://forum.civilea.com/thread-27464.html ***************************************

Print this item

  I can't launch CivilCAD 3D on my PC
Posted by: ahmed21z - 09-16-2010, 10:43 AM - Forum: Archive Problem - No Replies

I can't launch CivilCAD 3D on my PC

Dear Friends.

In the last days I can't launch CivilCAD 2010 on my PC, despite it was possible before

Waht is the probleme ?


Thank you for yours help in advance.

Ahmed

Print this item

Pages (2108): « Previous 1 … 1587 1588 1589 1590 1591 1592 1593 1594 1595 1596 1597 … 2108 Next »

Designed by CivilEA - Powered by MyBB