01-27-2024, 07:23 AM
(This post was last modified: 01-29-2024, 05:40 AM by Administrator.)
ISO 21725-2:2021 Simplified design of prestressed concrete bridges
Part 2: Box-girder bridges
Part 2: Box-girder bridges
| Size: 9.9 MB| Format: PDF| Quality: Scanner| Year: 2021-11| pages: 83
This document provides information to perform the design of the prestressed concrete box girder bridge for road that complies with the limitations established in 6.1. The rules of design as set forth in the document are simplifications of more elaborate requirements. Among several erection methods of box girder bridges, the provisions of this document are mainly applicable to full staging method (FSM).
Designs and details for new road bridges address structural integrity by considering the following:
— the use of continuity and redundancy to provide one or more alternate paths;
— structural members and bearing seat widths that are resistant to damage or instability; and
— external protection systems to minimize the effects of reasonably conceived severe loads.
Code:
***************************************
Content of this section is hidden, You must be registered and activate your account to see this content. See this link to read how you can remove this limitation:
http://forum.civilea.com/thread-27464.html
***************************************
Code:
***************************************
Content of this section is hidden, You must be registered and activate your account to see this content. See this link to read how you can remove this limitation:
http://forum.civilea.com/thread-27464.html
***************************************
Code:
***************************************
Content of this section is hidden, You must be registered and activate your account to see this content. See this link to read how you can remove this limitation:
http://forum.civilea.com/thread-27464.html
***************************************
This post has been made by CivilEA Post-Generator V2.4.2