Tonnage Estimation for steel structure.
Current time: 12-06-2019, 01:09 AM
Users browsing this thread: 1 Guest(s)
Author: lirizen
Last Post: allagui10
Replies 20
Views 10069

Tonnage Estimation for steel structure.
#21
Hi,
tonnage estimation depends on structure model.estimation should not exceeded 5% to 10% max.
Outside this limit it is not an estimation but error.
this is a software from ARCELORMITTAL.
To reduce the weight of the structure while complying with budgets.

* ACE SINGLE version 1.16.1

ArcelorMittal Cost Estimator Single
Cost and weight estimation for multi-storey buildings based on I-sections. Compares the different solutions available to four-column modules.
Code:
***************************************
Content of this section is hidden, You must be registered and activate your account to see this content. See this link to read how you can remove this limitation:

http://forum.civilea.com/thread-27464.html
***************************************


* ACE Multi version 2.8.1

ArcelorMittal Cost Estimator Multi
Cost and weight estimation for multi-storey buildings based on I-sections. Analyses the various construction systems of a complete building.
Code:
***************************************
Content of this section is hidden, You must be registered and activate your account to see this content. See this link to read how you can remove this limitation:

http://forum.civilea.com/thread-27464.html
***************************************

or download here

Code:
***************************************
Content of this section is hidden, You must be registered and activate your account to see this content. See this link to read how you can remove this limitation:

http://forum.civilea.com/thread-27464.html
***************************************

reguards
allagui
[-] The following 4 users say Thank You to allagui10 for this post:
  • kg85arun, lirizen, hans01, Dell_Brett
Reply




Users browsing this thread: 1 Guest(s)