03-15-2011, 06:28 PM
Detroit River Bridge
Size: 4.3 MB | Format: PDF | Year: 2008 | pages: 88
The scope of this Structure Study is to document the development process for the preferred alignment of the main bridge crossing the Detroit River including both the main structure over the river and the U.S. approach structure. The Canadian members of the Border Transportation Partnership will perform further development of the Canadian approach structure later. For the recommended project alternative, or Preferred Alternative, two bridge types, suspension and cable-stayed, are advanced for further development in this Early Preliminary Engineering phase.
Code:
***************************************
Content of this section is hidden, You must be registered and activate your account to see this content. See this link to read how you can remove this limitation:
http://forum.civilea.com/thread-27464.html
***************************************