09-12-2012, 11:40 AM
DRILLED SHAFT FOUNDATIONS FOR THE kcICON MISSOURI RIVER BRIDGE
Author: Paul J. Axtell, W. Robert Thompson & Dan A. Brown | Size: 1.5 MB | Format: PDF | Quality: Original preprint | pages: 10
The design-build delivery system is being used to erect the landmark Christopher Bond Bridge as part of the kcICON project. The cablestayed bridge is currently under construction and will span the Missouri River on I-29/35 in Kansas City, Missouri. The design-build process for the foundation work on this project has been successfully implemented as a result of cooperative efforts between the foundation designers and the constructors to develop a constructible design.
Code:
***************************************
Content of this section is hidden, You must be registered and activate your account to see this content. See this link to read how you can remove this limitation:
http://forum.civilea.com/thread-27464.html
***************************************
Code:
***************************************
Content of this section is hidden, You must be registered and activate your account to see this content. See this link to read how you can remove this limitation:
http://forum.civilea.com/thread-27464.html
***************************************
Regards,
Shadab
"Dream till you Live, Chase till you Die"
Shadab
"Dream till you Live, Chase till you Die"