IABSE 2001-Cable-Supported Bridges - Challenging Technical Limits
Current time: 12-16-2018, 08:34 PM
Users browsing this thread: 1 Guest(s)
Author: toa011
Last Post: Kurucz
Replies 1
Views 2199

IABSE 2001-Cable-Supported Bridges - Challenging Technical Limits
#1
IABSE 2001-Cable-Supported Bridges - Challenging Technical Limits

[Image: 41616080295627310973.jpg]

[Image: info.png]
Cable-Supported Bridges - Challenging Technical Limits
The Conference 'Cable-Supported Bridges', Seoul, 12 -14 June 2001, was organised by the Korean Group of IABSE and the Korea Highway Corporation. It attracted 365 participants from 35 countries.

The theme of the conference was introduced by the Keynote Lecturers: S.P. Chang, Korea; J. E. Roberts, USA; J. Combault, France; M.R. Feng, China; M. Kitagawa, Japan, C.K. Kau, Hong Kong. A Special Session on the recently completed Seohae and Yongyong Bridges in Korea was followed by Concurrent Sessions with the following themes:

• Conceptual Design: Case Studies I
• Conceptual Design: Case Studies II
• Trend and Innovative Ideas
• Static Behaviour
• Analysis Methods
• Aerodynamic Aspects
• Dynamics; Seismic Design
• System Identification, Monitoring and Control
• Construction and Maintenance and Operation.

The Keynote Lectures, papers and posters presented have been collected in a report and are a valuable contribution to the design, construction, operation and maintenance of cable-supported bridges.
Order Form

Seoul Conference Report - Vol 84(book and CD)

158 contributions in English
Book: 2 pages abstract per contribution
CD: 6 pages full contribution
335 pages



[Image: Download.png]

***************************************
Content of this section is hidden, You must be registered and activate your account to see this content. See this link to read how you can remove this limitation:

http://forum.civilea.com/thread-27464.html
***************************************


[Image: password.png]

***************************************
Content of this section is hidden, You must be registered and activate your account to see this content. See this link to read how you can remove this limitation:

http://forum.civilea.com/thread-27464.html
***************************************

.
[-] The following 14 users say Thank You to toa011 for this post:
  • robertsas, jcbv, kowheng, dajabar, lamkin, essenza, sujups, oanm2000, sodapas, triance, monter, 3fan, malc, marion33
Reply
#2
Size: 127 MB | Format: PDF

[Image: 34565250319164664491.png]


[Image: info.png]

Additonal link.

[Image: download.png]
***************************************
Content of this section is hidden, You must be registered and activate your account to see this content. See this link to read how you can remove this limitation:

http://forum.civilea.com/thread-27464.html
***************************************



[-] The following 16 users say Thank You to Kurucz for this post:
  • jcbv, malc, bhawk0, Jackass, danny045, slowet, faros3000, marion33, isurya, monter, blaze, mahyarov, vladmihai, carolinandra, milova, Aviator
Reply


Possibly Related Threads...
Thread Author Replies Views Last Post
Seismic behavior of box girder cable-stayed bridges considering large deformations arshiakh 1 1,501 03-01-2015, 09:09 PM
Last Post: bridgeengineer
Seismic Reliability Analysis of Cable Stayed Bridges Against First Passage Failure TAFATNEB 0 1,049 05-03-2014, 10:46 AM
Last Post: TAFATNEB
CHALLENGING DESIGN: FOUNDATIONS FOR TALL BUILDINGS TAFATNEB 0 1,651 08-28-2013, 09:02 PM
Last Post: TAFATNEB
IABSE Workshop Shanghai 2009 - Recent Major Bridges toa011 0 2,369 08-12-2010, 03:25 PM
Last Post: toa011



Users browsing this thread: 1 Guest(s)