CALCULATION OF THE TOWER PERIOD
info:
This spreadsheet
about calculation of the special period,
used simpson numeriacal integration method
calculation of the tower period.xls (Size: 27.5 KB / Downloads: 355)
CALCULATION OF THE TOWER PERIOD
info: This spreadsheet about calculation of the special period, used simpson numeriacal integration method calculation of the tower period.xls (Size: 27.5 KB / Downloads: 355)
11-08-2009, 11:35 AM
Dear Urbana,
thanks for this posting, but what formula to get "d (cm)" and "s.k" ? there is only value not formula. regards, robertsasmita
11-08-2009, 12:41 PM
dear robertsas
you should use sap2000 before using spreadsheet, q=1kn\m after using sap2000,you can view displacements,(d(cm)) if you can using simpson numerical integration method,you can type as me s.k value, regards
11-08-2009, 01:04 PM
Dear urbana,
This kind of information must be in the first post! Keep active! Dell Brett
11-08-2009, 02:24 PM
I am working on a new method for determining the period of the tower-like structures. This is an approximate formula, where you have to have the displacements. If you model it into SAP2000 you will get also the period. I am trying to derive a formula, based only on geometry.
|
Possibly Related Threads… | |||||
Thread | Author | Replies | Views | Last Post | |
Dynamic: Calculation of the Special Period for Multi-Story Building | preceptor | 0 | 3,841 |
11-11-2009, 10:11 AM Last Post: preceptor |