ACI PRC-506-22: Shotcrete - Guide
Author(s)/Editor(s): ACI Committee 506 | Size: 10 MB| Format: PDF| Quality: Scanner| Year: 2022| pages: 52 | ISBN: 9781641952019
This guide is a companion document to ACI 506.2, “Specification for Shotcrete,” and provides information on materials and properties of both dry-mix and wet-mix shotcrete. Most facets of the shotcrete process are covered, including application procedures, equipment requirements, and responsibilities of the shotcrete crew. Other aspects, such as preconstruction trials, craftsman qualification tests, materials tests, finished shotcrete acceptance tests, and equipment, are also discussed.
Keywords:
dry-mix shotcrete; mixture proportioning; placing; quality control; shotcrete; wet-mix shotcret
Code:
***************************************
Content of this section is hidden, You must be registered and activate your account to see this content. See this link to read how you can remove this limitation:
http://forum.civilea.com/thread-27464.html
***************************************
Code:
***************************************
Content of this section is hidden, You must be registered and activate your account to see this content. See this link to read how you can remove this limitation:
http://forum.civilea.com/thread-27464.html
***************************************
Code:
***************************************
Content of this section is hidden, You must be registered and activate your account to see this content. See this link to read how you can remove this limitation:
http://forum.civilea.com/thread-27464.html
***************************************
This post has been made by CivilEA Post-Generator V2.4.1