12-08-2012, 10:30 AM
Surveying for Beginners
Author: J. B, DAVIS | Size: 10 MB | Format: PDF | Quality: Scanner | Publisher: GEORGE WAHR, | Year: 1911 | pages: 286
LIST OF WORK
I. Reading Verniers.
II. Measuring with Steel Tapes.
Survey of a triangle.
Measuring the same distance eight times.
III. Handling Instruments.
Transit. Line Staff.
Level.
Leveling Rod.
IV. Survey of a triangle with a transit.
Twenty rod readings on the same B. M.
V. Reading Angles. Closing the horizon.
Peg Levels. Short circuit.
VI. Intersections and Connections.
VII. Passing Obstructions.
VIII. Circular Curves with Steel Tapes.
IX. Circular Curves with Steel Tapes and Transit.
X. Traverse Survey. Field with seven sides.
Peg Levels. Long circuit.
XI. Traverse Survey. Computing and platting.
Profile Leveling.
XII. Profile and Grade Line.
Staking out a grade.
XIII. Straight Line.
Staking out a building.
Code:
***************************************
Content of this section is hidden, You must be registered and activate your account to see this content. See this link to read how you can remove this limitation:
http://forum.civilea.com/thread-27464.html
***************************************
Regards,
Shadab
"Dream till you Live, Chase till you Die"
Shadab
"Dream till you Live, Chase till you Die"