10-29-2012, 06:44 AM
Manual for Design, Construction, and Maintenance of Orthotropic Steel Deck Bridges
Author: Connor, Robert Fisher, John Gatti, Walter Gopalaratnam, Vellore Kozy, Brian Leshko, Brian McQuaid, David L Medlock, Ronald Mertz, Dennis Murphy, Thomas Paterson, Duncan Sorensen, Ove Yadlosky, John | Size: 9.92 MB | Format: PDF | Quality: Original preprint | Publisher: HDR Engineering, Incorporated | Year: 2012 | pages: 291
Precast concrete bridge rail systems offer several advantages over traditional cast-in-place rail designs, including reduced construction time and costs, installation in a wide range of environmental conditions, easier maintenance and repair, improved railing quality, and greater flexibility for aesthetic treatments. The objective of this project was to develop a precast concrete bridge rail system that met the Test Level 4 impact safety standards provided in the American Association for State Highway and Transportation Officials (AASHTO) document entitled Manual for Assessing Safety Hardware (MASH). The design criteria for the new bridge rail system included criteria for barrier geometry, provisions for open and closed rail options, constructability, weight limitations, segment length, design impact loads, connection of barrier segments, and connection to the bridge deck among other factors. The research effort proceeded in several phases. First, the research focused on determining the overall concept for the new bridge rail system in terms of the rail configuration and geometry as well as the required barrier reinforcement. Next, design concepts for the joints connecting adjacent rail segments were designed and subjected to dynamic component testing in order to select a design capable of meeting design criteria for the precast bridge rail system. After selection of an appropriate rail joint, the researchers developed connection details for the attachment of the rail to the bridge deck. Once the design of the various precast bridge rail components was completed, a complete set of computer-aided design (CAD) details for the prototype precast concrete bridge rail system were completed. Following the design effort, recommendations were made regarding the full-scale testing required to implement the new, precast concrete bridge rail system.
Code:
***************************************
Content of this section is hidden, You must be registered and activate your account to see this content. See this link to read how you can remove this limitation:
http://forum.civilea.com/thread-27464.html
***************************************