CivilEA.com
  • Subscribe !
  • Register
  • Login
  • Home
  • Members
  • Help
  • Search
Civil Engineering Association eBooks Structural Books Bridge (Project and Technology) Precision Estimates of AASHTO T148: Measuring Length of Drilled Concrete Cores

Precision Estimates of AASHTO T148: Measuring Length of Drilled Concrete Cores
 mahyarov

Not-Activated

Iran
User ID: 1197
Joined: Apr 2009
Posts: 530
Threads: 451
Likes: 3,226 in 534 posts
Given Likes: 1492
Points:47,728 EP
#1
10-25-2012, 02:31 PM
Precision Estimates of AASHTO T148: Measuring Length of Drilled Concrete Cores

Author: Azari, Haleh | Size: 839 KB | Format: PDF | Quality: Original preprint | Publisher: Transportation Research Board | Year: 2010 | pages: 30 | ISBN: -

[Image: 18307650027097924471.png]


[Image: info.png]

This report presents the results of a round robin study to prepare precision estimates for AASHTO T148 test method used for determining the length of a core drilled from a concrete pavement or structural element. The materials for the round robin included six concrete cores taken from LTPP test sections of FHWA. The cores were either 4” or 6” in diameter with varying length in the range of 4” to 12”. The cores were representative of different FHWA LTPP concrete pavement test sections from which they were removed. The apparatus for measuring the length of the cores was a 3-point callipering device specified in AASHTO T148 test method. The six specimens were carried around to eleven laboratories and the length measurements were collected. The results indicated that the repeatability and reproducibility precisions are significantly different for different core diameters. Therefore, the precision estimates were prepared separately for 4” and 6” diameter specimens.

[Image: download.png]
Code:
***************************************
Content of this section is hidden, You must be registered and activate your account to see this content. See this link to read how you can remove this limitation:

http://forum.civilea.com/thread-27464.html
***************************************


This post has been made by CivilEA Post-Generator ver 2.1.6



[-] The following 4 users Like mahyarov's post:4 users Like mahyarov's post
  • kowheng, cace-01, oanm2000, Dell_Brett
« Next Oldest | Next Newest »

Users browsing this thread: 1 Guest(s)



Possibly Related Threads…
Thread Author Replies Views Last Post
  Concrete Segmental Bridges: Theory, Design, and Construction to AASHTO LRFD Specific carolinandra 1 965 01-03-2022, 07:57 AM
Last Post: poolmand
  AASHTO - Guide Specifications for Design and Construction of Segmental Concrete Bridg timosi™ 5 3,871 03-02-2013, 04:58 AM
Last Post: arshiakh
  Design of a Reinforced Concrete Deck-Girder Bridge to AASHTO & ACI Codes wafiullah 0 1,635 05-24-2011, 08:36 PM
Last Post: wafiullah

  • View a Printable Version
  • Subscribe to this thread

Designed by CivilEA - Powered by MyBB

Linear Mode
Threaded Mode