WPS FOR DIFFERENT MATERAIL
Author: BHARAT HEAVY ELECTRICALS LIMITED | Size: 3 MB | Format: PDF | Quality: Original preprint | Publisher: BHARAT HEAVY ELECTRICALS LIMITED | Year: 1993 | pages: 176
WPS (Welding Procedure Specifications)
A WPS is a document that describes how welding is to be carried out in production. They are recommended for all welding operations and many application codes and standards make them mandatory
What information should they include?
Sufficient details to enable any competent person to apply the information and produce a weld of acceptable quality. The amount of detail and level of controls specified on a WPS is dependant on the application and criticality of the joint to be welded.
For most applications the information required is generally similar to that recorded on a Procedure Qualification Record (PQR) or Welding Procedure Approval Record (WPAR), except that ranges are usually permitted on thicknesses, diameters, welding current, materials, joint types etc.
If a WPS is used in conjunction with approved welding procedures then the ranges stated should be in accordance with the approval ranges permitted by the welding procedure.
However careful consideration should be given to the ranges specified to ensure they are achievable, as the ranges given by welding procedure standards do not always represent good welding practice. For example welding positions permitted by the welding procedure standard may not be achievable or practical for certain welding processes or consumables.
EN ISO 15609-1 (formally EN 288 Part 2) European Standard For Welding Procedure Specifications
EN ISO 15609 Defines the contents of a Welding Procedure Specification in the form of a list of information that should be recorded. For some applications it may be necessary to supplement or reduce the list. For example only in the case of a procedure requiring heat input control would there be a necessity to quote travel speed or run-out length for manual processes.
ASME IX American Boiler and Pressure Vessel Code
QW 250 Lists the variables for each welding process, all the variables stated should be addressed. The range permitted by the WPS is dictated by the PQR or PQR’s used to qualify it.
Typical Items That Should Be Recorded On W.P.S:-
Common to all Processes .
Procedure number
Process type
Consumable Size, Type and full Codification.
Consumable Baking Requirement if applicable
Parent material grade and spec.
Thickness range.
Plate or Pipe, Diameter range
Welding Position
Joint Fit Up, Preparation, Cleaning, Dimensions etc.
Backing Strip, Back Gouging information.
Pre-Heat (Min Temp and Method)
Interpass If Required (Maximum Temperature recorded )
Post Weld Heat Treatment. If Required (Time and Temp)
Welding Technique (weaving,max run width etc.)
Arc Energy Limits should be stated if impact tests are required or if the material being welded is sensitive to heat input.
Code:
***************************************
Content of this section is hidden, You must be registered and activate your account to see this content. See this link to read how you can remove this limitation:
http://forum.civilea.com/thread-27464.html
***************************************
i know civil and architectural engineers are not very strong in welding topics,then i am sharing these document to facilitate your route of learning,so please read more about ASNT ,AWS and ASME codes,which are very important in construction projects and don't let the Mechanical Engineers to design your welding projects.