CivilEA.com
  • Subscribe !
  • Register
  • Login
  • Home
  • Members
  • Help
  • Search
Civil Engineering Association eBooks Journals, Papers and Presentations Deterministic vs Probabilistic Seismic Hazard Assessments

Deterministic vs Probabilistic Seismic Hazard Assessments
 Sumatra

Not-Activated

White-private
User ID: 14369
Joined: Feb 2010
Posts: 283
Threads: 103
Likes: 1,925 in 240 posts
Given Likes: 1580
Points:21,438 EP
#1
10-04-2011, 02:24 PM
Deterministic vs Probabilistic Seismic Hazard Assessment: an Exaggerated and Obstructive Dichotomy

Author: Prof. Julian Bommer | Size: 13.3 MB | Format: PDF | Publisher: Imperial College Press | Year: 2002 | pages: 31


[Image: info.png]

DETERMINISTIC VS. PROBABILISTIC SEISMIC HAZARD ASSESSMENT: AN EXAGGERATED AND OBSTRUCTIVE DICHOTOMY


About the author:

This very useful article is written by Professor Julian J. Bommer from Imperial College, UK. Authored and co-authored more than 100 publications in scientific journals, international conferences, book chapters and technical reports. He is a member of Editorial Boards of Engineering Geology and Bulletin of Earthquake Engineering; and formerly a member of Editorial Board of Bulletin of the Seismological Society of America. He is a member of Project Team PT1 for drafting and update of Part 1 of Eurocode 8 on seismic actions for design.

Abstract:

Deterministic and probabilistic seismic hazard assessment are frequently represented as irreconcilably di erent approaches to the problem of calculating earthquake ground motions for design, each method fervently defended by its proponents. This situation often gives the impression that the selection of either a deterministic or a probabilistic approach is the most fundamental choice in performing a seismic hazard assessment. The dichotomy between the two approaches is not as pronounced as often implied and there are many examples of hazard assessments combining elements of both methods. Insistence on the fundamental division between the deterministic and probabilistic approaches is an obstacle to the development of the most appropriate method of assessment in a particular case. It is neither possible nor useful to establish an approach to seismic hazard assessment that will be the ideal tool for all situations. The approach in each study should be chosen according to the nature of the project and also be calibrated to the seismicity of the region under study, including the quantity and quality of the data available to characterise the seismicity. Seismic hazard assessment should continue to evolve, unfettered by almost ideological allegiance to particular approaches, with the understanding of earthquake processes.

[Image: Download.png]
Code:
***************************************
Content of this section is hidden, You must be registered and activate your account to see this content. See this link to read how you can remove this limitation:

http://forum.civilea.com/thread-27464.html
***************************************


[Image: password.png]
Code:
***************************************
Content of this section is hidden, You must be registered and activate your account to see this content. See this link to read how you can remove this limitation:

http://forum.civilea.com/thread-27464.html
***************************************


Made By CivilEA Post-Generator ver 2.1



[-] The following 7 users Like Sumatra's post:7 users Like Sumatra's post
  • hazus, gulilero, malc, zrilek, ebaturalp, cigutierrezg, ibmarin
 axcel

Not-Activated

Bolivia
User ID: 11627
Joined: Jan 2010
Posts: 211
Threads: 16
Likes: 1,546 in 203 posts
Given Likes: 405
Points:7,626 EP
#2
05-03-2018, 01:54 AM
[Image: mirror.png]
Code:
***************************************
Content of this section is hidden, You must be registered and activate your account to see this content. See this link to read how you can remove this limitation:

http://forum.civilea.com/thread-27464.html
***************************************



[-] The following 8 users Like axcel's post:8 users Like axcel's post
  • pedzaquino, rami1976, PinkPant, subin91, lisine, zrilek, oanm2000, Dell_Brett
« Next Oldest | Next Newest »

Users browsing this thread: 1 Guest(s)



Possibly Related Threads…
Thread Author Replies Views Last Post
  Specialist Meeting on the Seismic Probabilistic Safety Assessment of Nuclear Faciliti TAFATNEB 0 3,048 08-10-2014, 01:26 PM
Last Post: TAFATNEB
  Nonlinear Soil-Site Effects in Probabilistic Seismic-Hazard Analysis TAFATNEB 0 2,876 04-12-2014, 02:21 PM
Last Post: TAFATNEB
  Objective assessment of source models for seismic hazard studies: with a worked ex... cve_jule 0 3,561 07-20-2011, 08:11 AM
Last Post: cve_jule
  the 1st Probabilistic Method in Seismic Hazard Analysis Sumatra 0 3,493 10-18-2010, 05:11 PM
Last Post: Sumatra

  • View a Printable Version
  • Subscribe to this thread

Designed by CivilEA - Powered by MyBB

Linear Mode
Threaded Mode