12-05-2018, 01:19 PM
ANSI/AISC 358-16
ANSI/AISC 358s1-18
An American National Standard
This supplement was developed by the AISC Connection Prequalification Review Panel (CPRP) using a consensus process. This document is the first supplement to ANSI/AISC 358-16, Prequalified Connections for Special and Intermediate Steel Moment Frames for Seismic Applications.
This supplement adds a new prequalified moment connection, the proprietary SlottedWeb Moment Connection, in a new Chapter 14. Chapter 11 covering the SidePlate Moment Connection has been expanded to include HSS columns and to permit bolted connections. Additionally, Chapter 10 covering the ConXtech CONXL Moment Connection has been revised to address a manufacturing safety issue.
A nonmandatory Commentary has been prepared to provide background for the provi-sions of the Standard, and the user is encouraged to consult it. Additionally, nonmandatory User Notes are interspersed throughout the Standard to provide concise and practical guid-ance in the application of the provisions.
May 12, 2016
(includes 2018 supplement)
Approved by the Connection Prequalification Review Panel
DIRECT DOWNLOAD LINK
ANSI/AISC 358s1-18
An American National Standard
This supplement was developed by the AISC Connection Prequalification Review Panel (CPRP) using a consensus process. This document is the first supplement to ANSI/AISC 358-16, Prequalified Connections for Special and Intermediate Steel Moment Frames for Seismic Applications.
This supplement adds a new prequalified moment connection, the proprietary SlottedWeb Moment Connection, in a new Chapter 14. Chapter 11 covering the SidePlate Moment Connection has been expanded to include HSS columns and to permit bolted connections. Additionally, Chapter 10 covering the ConXtech CONXL Moment Connection has been revised to address a manufacturing safety issue.
A nonmandatory Commentary has been prepared to provide background for the provi-sions of the Standard, and the user is encouraged to consult it. Additionally, nonmandatory User Notes are interspersed throughout the Standard to provide concise and practical guid-ance in the application of the provisions.
May 12, 2016
(includes 2018 supplement)
Approved by the Connection Prequalification Review Panel
DIRECT DOWNLOAD LINK
Code:
***************************************
Content of this section is hidden, You must be registered and activate your account to see this content. See this link to read how you can remove this limitation:
http://forum.civilea.com/thread-27464.html
***************************************