COMPOSITE BRIDGE DESIGN FOR SMALL AND MEDIUM SPANS
Size: 10.58 MB | Format: PDF | Year: 2002 | pages: 140
This Design Guide provides all necessary information about the construction and static calculation of the superstructure of composite bridges for small and medium spans by using new innovative standard solutions.
The Design Guide includes all main topics concerning erection, construction details and the static analyses. Design charts are added to enable a fast forward pre-design. This report is based on the ECSC-Project “Composite bridge design for small and medium spans” which is shortly described later on. The results of the test programmes performed in this ECSCproject are summarised in standard solutions in this Design Guide. This Design Guide covers composite bridges with standard solutions by applying partially- and fully prefabricated slabs as well as solid slabs up to a span of 50 m. Furthermore a software has been developed to verify different kinds of constructions and enable a very fast static calculation by the practical engineer. Two examples of a single span bridge with fully prefabricated elements and a two span bridge with partially prefabricated slab are attached as tender documents including the static analyses by using the software and drawings with all details.
The Design Guide includes all main topics concerning erection, construction details and the static analyses. Design charts are added to enable a fast forward pre-design. This report is based on the ECSC-Project “Composite bridge design for small and medium spans” which is shortly described later on. The results of the test programmes performed in this ECSCproject are summarised in standard solutions in this Design Guide. This Design Guide covers composite bridges with standard solutions by applying partially- and fully prefabricated slabs as well as solid slabs up to a span of 50 m. Furthermore a software has been developed to verify different kinds of constructions and enable a very fast static calculation by the practical engineer. Two examples of a single span bridge with fully prefabricated elements and a two span bridge with partially prefabricated slab are attached as tender documents including the static analyses by using the software and drawings with all details.
Code:
***************************************
Content of this section is hidden, You must be registered and activate your account to see this content. See this link to read how you can remove this limitation:
http://forum.civilea.com/thread-27464.html
***************************************