CivilEA.com
  • Subscribe !
  • Register
  • Login
  • Home
  • Members
  • Help
  • Search
Civil Engineering Association eBooks Geotechnical Engineering Foundation & Geotechnics in general NYDOT: GROUND ANCHOR INSPECTOR'S MANUAL

NYDOT: GROUND ANCHOR INSPECTOR'S MANUAL
 tuanpecc1

Semi Senior Member

Registered
Vietnam
User ID: 16595
Joined: Mar 2010
Posts: 97
Threads: 63
Likes: 1,426 in 86 posts
Given Likes: 1360
Points:7,173 EP
#1
10-16-2010, 01:53 PM (This post was last modified: 01-05-2012, 08:20 PM by usman.)
GROUND ANCHOR INSPECTOR'S MANUAL

[Image: 61387838475237039705.png]


[Image: info.png]
Publisher: NEW YORK STATE DEPARTMENT OF TRANSPORTATION
Date: APRIL 2007
Pages: 40

The purpose of this manual is to provide the inspector and Engineer-In-Charge with a quick and easy-to-use set of inspection guidelines for the various aspects of tieback construction, including preinstallationinspection, installation, testing and trouble shooting load cell problems.
This guide does not cover every possible situation the inspector may encounter. The enclosed checklists are intended to serve as reminders for inspectors already familiar with tieback installation. Before using this manual, the reader should refer to the chapter entitled "Ground anchor Inspector's Manual", in the Task Force 27 report entitled "hi Situ Soil hnproveinent Techniques", prepared by the Subcommittee on New Highway Materials of the AASHTO-AGC--ARTBA Joint Committee. Copies of thus chapter are available upon request from the Geotechnical Engineering Bureau.


[Image: Download.png]

Code:
***************************************
Content of this section is hidden, You must be registered and activate your account to see this content. See this link to read how you can remove this limitation:

http://forum.civilea.com/thread-27464.html
***************************************

[Image: password.png]

Code:
***************************************
Content of this section is hidden, You must be registered and activate your account to see this content. See this link to read how you can remove this limitation:

http://forum.civilea.com/thread-27464.html
***************************************



[-] The following 24 users Like tuanpecc1's post:24 users Like tuanpecc1's post
  • kowheng, robertsas, chigozie, maad59, Apache, Dell_Brett, cordoba123, hrezaei, huy2009, pedzaquino, grass, cigutierrezg, kaci, cristi, nhim4mat2006, ilgar, Gabemzaman, julioreptil, Evandrojr, ptqc06, wanazri, peymanlord, shadabg, Rami11
« Next Oldest | Next Newest »

Users browsing this thread: 1 Guest(s)



Possibly Related Threads…
Thread Author Replies Views Last Post
  Geotechnical Engineering Circular No. 13 Ground Modification Methods Reference Manual ELAHI1979 0 751 01-05-2019, 11:08 AM
Last Post: ELAHI1979
  RECENT ADVANCES IN GROUND ANCHOR tuanpecc1 2 1,683 09-05-2012, 08:10 AM
Last Post: shadabg
  Ground anchor systems tuanpecc1 3 2,548 09-05-2012, 06:42 AM
Last Post: shadabg
  NYDOT: ROCK SLOPE RATING PROCEDURE tuanpecc1 0 1,081 10-20-2010, 03:31 PM
Last Post: tuanpecc1
  NYDOT: Bank and channel protective lining design procedures tuanpecc1 0 942 10-20-2010, 02:58 PM
Last Post: tuanpecc1
  NYDOT: MECHANICALLY STABILIZED EARTH SYSTEM INSPECTION MANUAL tuanpecc1 0 1,042 10-20-2010, 02:24 PM
Last Post: tuanpecc1
  NYDOT: COMPUTATION OF SKIN FRICTION ON DRIVEN NONTAPERED PILES IN COHESIONLESS SOIL tuanpecc1 0 1,074 10-19-2010, 04:17 PM
Last Post: tuanpecc1

  • View a Printable Version
  • Subscribe to this thread

Designed by CivilEA - Powered by MyBB

Linear Mode
Threaded Mode