CivilEA.com
  • Subscribe !
  • Register
  • Login
  • Home
  • Members
  • Help
  • Search
Civil Engineering Association Civil Engineering Resource Civil Engineering Documents Calculation Notes & Analysis Files Pile Driving Record Calculation (SPP Foundation)

Pile Driving Record Calculation (SPP Foundation)
 lednar_ved

Not-Activated

White-private
User ID: 13300
Joined: Feb 2010
Posts: 48
Threads: 19
Likes: 450 in 40 posts
Given Likes: 1289
Points:2,867 EP
#1
07-29-2010, 05:38 AM (This post was last modified: 04-11-2011, 07:08 AM by Grunf.)
Pile Driving Record (SPP Foundation)

[Image: info.png]
A sample pile driving record using the MODIFIED HILEY's FORMULA for the Steel Pipe Pile Foundation of Bridge Abutment.
Name of Bridge: Ihawan Bridge
Location: Philippines
Superstructure: AASHTO PC Girder
Substructure: SPP Foundation
Length of Bridge: 114.9m
No. of Span: 3



[Image: Download.png]

Code:
***************************************
Content of this section is hidden, You must be registered and activate your account to see this content. See this link to read how you can remove this limitation:

http://forum.civilea.com/thread-27464.html
***************************************



[-] The following 16 users Like lednar_ved's post:16 users Like lednar_ved's post
  • daywalker, Mohoh77, isurya, civilteam, madkestas, kam009, sasan7351, killerbee, gelbert, ramla2002, kami, gibran, telengkude, anezregar, tremonti, Nilupa
 Nilupa

Semi Senior Member

Banned
Sri Lanka
User ID: 11056
Joined: Nov 2009
Posts: 62
Threads: 49
Likes: 95 in 26 posts
Given Likes: 4796
Points:4,481 EP
#2
04-11-2011, 05:04 AM
Dead Link. Pls. reupload if possible.




  •
« Next Oldest | Next Newest »

Users browsing this thread: 1 Guest(s)



Possibly Related Threads…
Thread Author Replies Views Last Post
  SPP Pile Driving Record Using JRA Specs lednar_ved 2 6,559 07-15-2011, 01:02 PM
Last Post: jpver

  • View a Printable Version
  • Subscribe to this thread

Designed by CivilEA - Powered by MyBB

Linear Mode
Threaded Mode