Pile Driving Record Calculation (SPP Foundation) - Printable Version +- Civil Engineering Association (https://forum.civilea.com) +-- Forum: Civil Engineering Resource (https://forum.civilea.com/forum-1.html) +--- Forum: Civil Engineering Documents (https://forum.civilea.com/forum-89.html) +---- Forum: Calculation Notes & Analysis Files (https://forum.civilea.com/forum-80.html) +---- Thread: Pile Driving Record Calculation (SPP Foundation) (/thread-14707.html) |
Pile Driving Record Calculation (SPP Foundation) - lednar_ved - 07-29-2010 Pile Driving Record (SPP Foundation)
A sample pile driving record using the MODIFIED HILEY's FORMULA for the Steel Pipe Pile Foundation of Bridge Abutment. Name of Bridge: Ihawan Bridge Location: Philippines Superstructure: AASHTO PC Girder Substructure: SPP Foundation Length of Bridge: 114.9m No. of Span: 3 Code: *************************************** RE: Pile Driving Record Calculation (SPP Foundation) - Nilupa - 04-11-2011 Dead Link. Pls. reupload if possible. |