Code:
Content of this section is hidden, You must be registered and upgrade your account to see this content.See this link to read how you can remove this limitation:
👉 CLICK HERE 👈
regards,
robertsasmita
|
Code: Content of this section is hidden, You must be registered and upgrade your account to see this content.See this link to read how you can remove this limitation: 👉 CLICK HERE 👈 regards, robertsasmita
The following 46 users Like robertsas's post:• kowheng, kowheng, Dell_Brett, Dell_Brett, aslam, aslam, rendel_©, rendel_©, vvvv, vvvv, hsccindia, hsccindia, zrilek, zrilek, essam2109, essam2109, Nedian, Nedian, tonmjr, tonmjr, binh2907, binh2907, nigema, simanta, michaelsoe, deanz_75, Hamza-MKD, mz55, rizal13, ska51, kmmh76, tynhanh, daywalker, Petrit, Clouseau, nhim4mat2006, oanm2000, avscorreia, utan, cigutierrezg,
12-04-2010, 06:20 AM
stone age was not finished due to lack of stones. . . . . .tEChNOlOGY Changed
The following 23 users Like usman's post:• kowheng, tynhanh, malc, daywalker, cigutierrezg, Clouseau, nhim4mat2006, Dell_Brett, oanm2000, avscorreia, pedronick, utan,
12-04-2010, 09:43 PM
More information (formats. PDF):
a. Reliability of shallow foundation design using the Standard Penetration Test b. Table 1 summarizes a total of 27 sources of uncertainty and bias, classified in five categories. This classification aims to assist the practicing engineer in taking the necessary measures to minimize the uncertainties in the performance of the test: Category A includes sources that depend on the type of soil, with emphasis in sources related to granular materials since the use of the SPT is generally not recommended for cohesive soils. Category B lists sources of uncertainty due to the presence of water. Category C includes reducible sources re-lated to the equipment and its maintenance. Category D includes sources that are reducible if the test procedure is performed care-fully. Category E lists irreducible sources in the investigation procedure. Code: Content of this section is hidden, You must be registered and upgrade your account to see this content.See this link to read how you can remove this limitation: 👉 CLICK HERE 👈
The following 11 users Like henrybill's post:• Clouseau, oanm2000, avscorreia, Dell_Brett, usman, isurya, utan, cigutierrezg, 3fan, jaejeong, nickycruz |
| Possibly Related Threads… | |||||
| Thread | Author | Replies | Views | Last Post | |
| Foundation: Telecom, Transmission, Guyed Tower, Pole Footing - TIA 222F & ACI | mahfuzbangla | 7 | 23,576 |
06-01-2021, 11:39 AM Last Post: structural |
|
| Foundation: Combined Trapezoidal Footing Design by JEC | robertsas | 2 | 9,121 |
03-26-2014, 10:39 AM Last Post: andersen3 |
|
| Foundation: Combined Rectangular Footing Design by JEC | robertsas | 2 | 9,282 |
03-26-2014, 10:37 AM Last Post: andersen3 |
|
| 38 Foundation Design spreadsheet based on ACI 318-08 | portal61 | 2 | 12,837 |
01-17-2014, 11:42 PM Last Post: ykhackhack |
|
| Foundation: Prestressed Concrete Pile Design | kowheng | 14 | 32,152 |
05-23-2012, 10:22 AM Last Post: BennyP |
|
| Pole Foundation Analysis | usman | 1 | 9,947 |
03-15-2012, 03:44 PM Last Post: Diquan |
|
| Foundation: Oil Storage Tank Foundation Design | duazo2009 | 0 | 8,879 |
01-19-2011, 02:26 AM Last Post: duazo2009 |
|