CivilEA.com
  • Subscribe !
  • Register
  • Login
  • Home
  • Members
  • Help
  • Search
Civil Engineering Association Various Free Discussion Structural Consultation Price

Structural Consultation Price
 iceman84

Not-Activated

White-private
User ID: 1829
Joined: May 2009
Posts: 245
Threads: 48
Likes: 419 in 154 posts
Given Likes: 402
Points:8,906 EP
#11
03-08-2011, 10:28 AM
In Romania the price is not constant, it depends on the building type and surface, but generally is between 3-4$/sqm and it can decrease in the case of buildings with larger surfaces.



[-] The following 3 users Like iceman84's post:3 users Like iceman84's post
  • oanm2000, ranger, pulikesi23rd
 kashero

Not-Activated

Cambodia
User ID: 30695
Joined: Oct 2010
Posts: 8
Threads: 4
Likes: 9 in 3 posts
Given Likes: 209
Points:680 EP
#12
03-08-2011, 12:00 PM
In Cambodia, 5% of the entire project price.



[-] The following 3 users Like kashero's post:3 users Like kashero's post
  • oanm2000, ranger, pulikesi23rd
 Aiyub

Not-Activated

White-private
User ID: 2192
Joined: Jun 2009
Posts: 1
Threads: 0
Likes: 4 in 2 posts
Given Likes: 104
Points:144 EP
#13
03-08-2011, 05:24 PM
In India it's depends on project:-
For Buildings it is 5 Rs/sq. ft or 1% of project cost
For bridges it will be ranging from 1.5 to 5% of total project cost.
( as in my knowledge )



[-] The following 2 users Like Aiyub's post:2 users Like Aiyub's post
  • ranger, pulikesi23rd
 essenza

Not-Activated

White-private
User ID: 865
Joined: Mar 2009
Posts: 206
Threads: 54
Likes: 296 in 111 posts
Given Likes: 294
Points:13,816 EP
#14
03-10-2011, 12:05 AM (This post was last modified: 03-10-2011, 12:06 AM by essenza.)
In Indonesia, is about
structural : 1-2 usd/m2
ME: 1.5-2.5 usd/m2
Arc: 2-3 usd/m2
(1usd = rp 10000)
However many new consultant dare to be lower than the half of above price. We're killing each other here in Indonesia :dash2:

DE



[-] The following 2 users Like essenza's post:2 users Like essenza's post
  • concreteok, ranger
 Devil_Red

Not-Activated

White-private
User ID: 23966
Joined: Jun 2010
Posts: 47
Threads: 5
Likes: 54 in 28 posts
Given Likes: 22
Points:2,709 EP
#15
03-11-2011, 01:41 PM
Essenza,

How come the MEP consultancy rate is higher than structural cost , i don't quite understand.
Probably the total C&S will be higher than MEP , eh?




  •
 goober

Not-Activated

United States
User ID: 3294
Joined: Jul 2009
Posts: 52
Threads: 3
Likes: 227 in 47 posts
Given Likes: 402
Points:2,736 EP
#16
03-14-2011, 06:25 PM
The USA is 5% of total building cost if your lucky.



[-] The following 1 user Likes goober's post:1 user Likes goober's post
  • ranger
 haze

Not-Activated

White-private
User ID: 166
Joined: Jan 2009
Posts: 31
Threads: 17
Likes: 128 in 26 posts
Given Likes: 789
Points:1,781 EP
#17
03-15-2011, 02:26 AM

We get .05 to 2 % of the total construction in the USA. I have never got 5% of total construction. That would be great. The architect fee ranges from 5 to 15% . The engineer are a sub to the architect.



[-] The following 2 users Like haze's post:2 users Like haze's post
  • ranger, handresy
 goober

Not-Activated

United States
User ID: 3294
Joined: Jul 2009
Posts: 52
Threads: 3
Likes: 227 in 47 posts
Given Likes: 402
Points:2,736 EP
#18
03-17-2011, 08:27 PM
@haze

Does your percentage include everything, start to finish, or just permit drawings? Barring any change orders, there is a lot of work to be done after your initial construction set. I usually spend far more time on construction admin then initial design.

I admit that 5% is a nice dream, but I think 2% is a bit low. But what do I know.... I consult on my own and I have no work at all. I am spending my days reading all the classic literature I missed out on while in engineering school. If anyone has any Tolstoy, Dostoevsky, Maugham, Hemingway, etc... questions, I am your man.



[-] The following 2 users Like goober's post:2 users Like goober's post
  • mojtaba808, ranger
 hmaida2008

Not-Activated

White-private
User ID: 20797
Joined: May 2010
Posts: 12
Threads: 7
Likes: 98 in 12 posts
Given Likes: 11
Points:709 EP
#19
03-17-2011, 08:42 PM
in Algeria in the best cases 5%



[-] The following 1 user Likes hmaida2008's post:1 user Likes hmaida2008's post
  • ranger
 Umer.Aleem

Not-Activated

White-private
User ID: 4641
Joined: Aug 2009
Posts: 33
Threads: 22
Likes: 62 in 27 posts
Given Likes: 1223
Points:2,512 EP
#20
04-26-2011, 11:58 AM
In Pakistan 2-3% of total cost of the project for Structural Designing+Detailing or Drawings
and 10-15% for Construction
These may vary in accordance of Size of Project, specialty and the Risk Factor involved....

Regards,
Umer Aleem



[-] The following 1 user Likes Umer.Aleem's post:1 user Likes Umer.Aleem's post
  • ranger
« Next Oldest | Next Newest »

Users browsing this thread: 1 Guest(s)
Pages (3): « Previous 1 2 3 Next »



Possibly Related Threads…
Thread Author Replies Views Last Post
  Ansys Mechanical Price scudelari 2 6,397 01-03-2019, 09:52 AM
Last Post: lisine
  Price Engineering yucapareja 1 4,029 11-20-2014, 02:10 PM
Last Post: nickycruz
  International Engineering Price yucapareja 5 6,612 03-08-2011, 07:39 AM
Last Post: rkce
  Ethical in consultation business essenza 8 10,027 03-01-2011, 03:32 PM
Last Post: Diquan

  • View a Printable Version
  • Subscribe to this thread

Designed by CivilEA - Powered by MyBB

Linear Mode
Threaded Mode