dear friends
i hv solve one RCC building in Etabs considering dynamic effects using response spectra method an i m getting natural period 2.37 sec an base shear 1319 kN. An i hv solved same problem manually also i got natural period 0.97 sec and base shear 1320 kN but , the problem s that natural period by manually an etabs r not matching plz some one help me i m attaching etab file also.
these r the details of building
Live load : 4.0 kN/m2 at typical floor
: 1.5 kN/m2 on terrace
Floor finish : 1.0 kN/m2
Water proofing : 2.0 kN/m2
Terrace finish : 1.0 kN/m2
Zone III : Z= 0.16
Earthquake load : As per IS-1893 (Part 1) - 2002
Depth of foundation below ground : 2.5 m
Type of soil : Type II, Medium as per IS:1893
Storey height : Typical floor: 5 m, GF: 3.4 m
Floors : G.F. + 5 upper floors.
Plinth level : 0.6 m
Walls : 230 mm thick brick masonry walls
only at periphery.
i hv solve one RCC building in Etabs considering dynamic effects using response spectra method an i m getting natural period 2.37 sec an base shear 1319 kN. An i hv solved same problem manually also i got natural period 0.97 sec and base shear 1320 kN but , the problem s that natural period by manually an etabs r not matching plz some one help me i m attaching etab file also.
these r the details of building
Live load : 4.0 kN/m2 at typical floor
: 1.5 kN/m2 on terrace
Floor finish : 1.0 kN/m2
Water proofing : 2.0 kN/m2
Terrace finish : 1.0 kN/m2
Zone III : Z= 0.16
Earthquake load : As per IS-1893 (Part 1) - 2002
Depth of foundation below ground : 2.5 m
Type of soil : Type II, Medium as per IS:1893
Storey height : Typical floor: 5 m, GF: 3.4 m
Floors : G.F. + 5 upper floors.
Plinth level : 0.6 m
Walls : 230 mm thick brick masonry walls
only at periphery.
Code:
***************************************
Content of this section is hidden, You must be registered and activate your account to see this content. See this link to read how you can remove this limitation:
http://forum.civilea.com/thread-27464.html
***************************************