09-26-2010, 05:47 AM
Dear 88FeNIX & members of Civilea who interesting on pushover analysis
I think all procedures to calculate "R" in FEMA is for single tower only.
What if the building has 2 towers over the basement or the podium ?
What the different in pushover anslysis process ?
Can I do the pushover analysis with one single file of etabs/sap2000 ( all the building : basement, podium & the 2 tower being modeled in one model, not sepate/divide it ) ?
Thanks
Paladin
I think all procedures to calculate "R" in FEMA is for single tower only.
What if the building has 2 towers over the basement or the podium ?
What the different in pushover anslysis process ?
Can I do the pushover analysis with one single file of etabs/sap2000 ( all the building : basement, podium & the 2 tower being modeled in one model, not sepate/divide it ) ?
Thanks
Paladin