Zamil Steel Design Manual DM 3.10
This revision of design manual has been prepared to account for the changes of ZAMIL STEEL standards
during the last four years since 1999 regarding single skin & Tempcon panels, built-up sections standard
dimensions, serviceability consideration and some standard connections, also this revision of design
manual presents the results of special technical studies carried out in the ZAMIL STEEL PRD department
including finite element studies using most recent software techniques, buckling analysis studies and also
derived formulas using numerical correlation studies. Designers can make use of these studies to enhance
the design process.
This revision of the design manual also resolves some miscellaneous and confusing points that were
reported to PRD department.
The contents of this manual were rearranged and presented in “Adobe Acrobat” format along with
navigation pane to ensure effective and fast use of this manual.
Design/Quote engineers are strongly advised to read this manual as a whole in conjunction with the
standard codes and manuals stated in clause 2.1 page 2-1 of this manual.
The clauses containing the major changes made in this revision of design manual (DM 03.10.00) are as
follows :-
2.4. Serviceability consideration _________ 2-15
3.5. Expansion Joints __________________ 3-8
3.7. Bracing Systems Arrangement_______ 3-11
4.1.2.1. Built up section _________________ 4-3
4.1.2.2. Galvanized primary members______ 4-5
4.3. Flange braces____________________ 4-22
4.6. Standard Anchor Bolts _____________ 4-67
4.7.8. Crane Beam ___________________ 4-74
5.1. Panels___________________________ 5-1
5.2.1.7. Double ‘C’ -sections ____________ 5-27
5.2.2. Design Of Roof Purlins ___________ 5-29
5.2.4. Design Of Eave Struts ____________ 5-35
6.1.2. End wall Rafter Design Concept _____ 6-2
6.2.2. End Wall Posts Design Concept _____ 6-6
7.2.3.1 Top Running Cranes ____________ 7-11
7.3. Bracing Design Notes______________ 7-13
8.2.1.2.Connection for Lateral Load _______ 8-2
9.1. Design of Joists ___________________ 9-2
9.3. Design of Beams __________________ 9-7
10.11. Egypt Jobs in Non-Free Zone Areas 10-6
12.1. Drainage______________________ 12-1
Code:
***************************************
Content of this section is hidden, You must be registered and activate your account to see this content. See this link to read how you can remove this limitation:
http://forum.civilea.com/thread-27464.html
***************************************
Edit reason: dead link deleted. (G)