12-15-2024, 05:33 AM
ACI SPEC-336.1-01: Construction of Drilled Piers
| Size: 9.49 MB| Format: PDF| Quality: Scanner| Year: 2001
This Specification addresses requirements for drilled pier construction. Drilled piers are sometimes called drilled shafts, drilled caissons, drilled piers with bells, drilled shafts with bells, or bored piles. This Specification includes: excavation; the use of liners and casing; drilling slurry and concrete free-fall placement methods; testing; reinforcement fabrication and placement; concrete properties and placement; quality control and quality assurance; and acceptance. The successful installation and performance of a drilled pier is fundamentally dependent on the means and methods of construction along with the effects of the site-specific subsurface conditions.
Keywords:
bored pile; caisson; casing, drilled caisson; drilled pier; drilled shaft; drilling fluid; excavation; foundation; free-fall; liner; obstruction; slurry.
Code:
***************************************
Content of this section is hidden, You must be registered and activate your account to see this content. See this link to read how you can remove this limitation:
http://forum.civilea.com/thread-27464.html
***************************************
Code:
***************************************
Content of this section is hidden, You must be registered and activate your account to see this content. See this link to read how you can remove this limitation:
http://forum.civilea.com/thread-27464.html
***************************************
Code:
***************************************
Content of this section is hidden, You must be registered and activate your account to see this content. See this link to read how you can remove this limitation:
http://forum.civilea.com/thread-27464.html
***************************************
This post has been made by CivilEA Post-Generator V2.4.4