| Size: 32 MB| Format: PDF| Quality: Original preprint| Year: 29 November 2018 | ISBN: 9780478433661
The Engineering Assessment Guidelines (the guidelines) provide a technical basis for engineers to carry out seismic assessments of existing buildings within New Zealand. The guidelines support seismic assessments for a range of purposes, and must be used by territorial authorities to decide whether or not a building is earthquake prone in terms of the Building Act 2004.
Contents
The guidelines provide the assessment component of the earthquake-prone building regulations and EPB methodology that came into force on 1 July 2017. Version 1 of the guidelines must be used for all engineering assessments that territorial authorities use to decide whether or not a building is earthquake prone.
The guidelines provide methods for two levels of assessment. Initial Seismic Assessment (ISA) provides a broad indication of the likely level of seismic performance of a building. In some cases, an ISA will be followed by a more comprehensive Detailed Seismic Assessment (DSA).
Both assessment methods rate a building as a percentage of the new building standard applied to an equivalent new building on the same site. For assessment purposes, new building standard refers to the minimum life safety performance requirements of Building Code clause B1 – Structure.
The guidelines have three distinct parts.
Part A – Assessment objectives and principles
Part A outlines the scope and application, and provides a general overview of the seismic assessment process. It describes the linkage with the relevant requirements of the Building Act 2004, associated regulations and the EPB methodology.
Part B – Initial seismic assessment
Part B describes the Initial Seismic Assessment (ISA). The ISA provides a broad indication of the likely level of seismic performance of a building. In some cases, an ISA will be followed by a Detailed Seismic Assessment.
Part C – Detailed seismic assessment
Part C describes the Detailed Seismic Assessment (DSA). The DSA provides a more comprehensive assessment than an ISA.
Part C is published in ten independent sections. Sections C1 to C4 collectively build on Part A and are to be used in conjunction with guidance for specific materials in Sections C5 to C10.
Section C1 provides an overview to the DSA process. It explains the objectives and sets out key steps for an assessment at this level, including specific guidance on the calculation of an earthquake score in the context of a DSA.
Section C2 sets out a DSA procedure. It specifies general analysis requirements including basic assumptions, selection of seismic analysis procedures, and the consideration of structural weaknesses.
Section C3 explains how to determine the earthquake hazard and loading requirements used to assess the Ultimate Limit State (ULS) demand that relates the building capacity to the standard required for a new building.
Section C4 provides guidance for considering geotechnical behaviour and its impact on the seismic behaviour and earthquake rating of existing buildings. This section includes guidance on the recommended interactions between structural engineers and geotechnical engineers and their particular roles and responsibilities.
Sections C5 to C9 provide assessment methods for the specific construction materials of existing buildings:
C5 – Concrete buildings
C6 – Structural steel buildings
C7 – Moment resisting frames with infill panels
C8 – Unreinforced masonry (URM) buildings
C9 – Timber buildings
Section C10 gives specific recommendations for assessing Secondary Structural and Non-Structural (SSNS) building elements. The guidance in this section allows these elements to be rated either independently or in conjunction with an overall building assessment.
Templates
The Initial Evaluation Procedure (IEP) assessment template [ZIP 2.6MB] (note: this is a maco-enabled spreadsheet supplied in a ZIP file) provides working versions of tables IEP-1 to IEP-5.
The assessment summary report is used to summarise the key points from initial seismic assessments (Part B) and detailed seismic assessments (Part C) and must be included at the front of all engineering assessments for earthquake-prone buildings purposes.
Code:
***************************************
Content of this section is hidden, You must be registered and activate your account to see this content. See this link to read how you can remove this limitation:
http://forum.civilea.com/thread-27464.html
***************************************
Code:
***************************************
Content of this section is hidden, You must be registered and activate your account to see this content. See this link to read how you can remove this limitation:
http://forum.civilea.com/thread-27464.html
***************************************
Code:
***************************************
Content of this section is hidden, You must be registered and activate your account to see this content. See this link to read how you can remove this limitation:
http://forum.civilea.com/thread-27464.html
***************************************
This post has been made by CivilEA Post-Generator V2.4.1