CivilEA.com
  • Subscribe !
  • Register
  • Login
  • Home
  • Members
  • Help
  • Search
Connect with your social network account

Civil Engineering Association CivilEA Shop Own-Copyrighted Material [CivilEA SHOP] Unique package: Blast Proof Substation, Control Room, ITR, Transformer foundation

[CivilEA SHOP] Unique package: Blast Proof Substation, Control Room, ITR, Transformer foundation
 Administrator

CivilEA Founder

Administrators
United Nations
User ID: 1
Joined: Dec 2008
Posts: 3,202
Threads: 271
Likes: 21,082 in 2,339 posts
Given Likes: 4183
Points: 536,864 EP

#1
07-31-2021, 01:07 PM (This post was last modified: 01-01-2023, 06:01 AM by Administrator.)
Unique package: Blast Proof Petrochemical Buildings, Substation, Control Room, ITR, Transformer foundation and Shelter

Size: 96 MB | Format: DWG, DOCX, SDB | Quality: Unspecified | Publisher: CivilEA.com


[Image: 72398561573200330118.png]


[Image: info.png]

Dear All
This is Unique package that You will never find it anywhere else.
This package contain 5 different blast proof  Substation and ITR, Control Room building, Transformer foundation and shelter drawings (more than 170 native AutoCAD drawings).  also it contain some calculation book, Design file (SAP2000) and all related code and standards that you need for design of blast proof building is petrochemical facilities.
They are real project in Oil, Gas and Petrochemical industries.
This is a valuable collection.
This package including:
  • More than 170 DWG (Drawings) Special Blast proof building drawings.
  • Calculation Notes.
  • SAP2000 SDB design file.
[Image: screen.png]
[Image: 01761365524390827979.png]
[Image: 17881697187324283333.png]
[Image: 65004629958487806012.png]
[Image: 93684442337911541259.png]
[Image: 80835917808093844508.png]
[Image: 77705182416654063165.png]
[Image: 32690081096053390681.png]
[Image: 61136886331077553308.png]


[Image: download.png]

THIS IS SPECIAL PRICE (ORIGINAL PRICE IS 80 USD)


Cost: 8USD
#23

Guests Can Not Buy Paid Contents. Please Login or Register to Buy Paid Contents.



This post has been made by CivilEA Post-Generator V2.3.1



[-] The following 6 users Like Administrator 's post:6 users Like Administrator 's post
  • mohamz, toby62, narendra, Umer.Aleem, ranger, thaertrisi
 Administrator

CivilEA Founder

Administrators
United Nations
User ID: 1
Joined: Dec 2008
Posts: 3,202
Threads: 271
Likes: 21,082 in 2,339 posts
Given Likes: 4183
Points: 536,864 EP

#2
08-01-2021, 09:55 AM
This package is included 5 different building:
  • Substation 1 (SS1-ITR12): (43 DWG + Calculation Notes + SAP2000) it is non-blast building, including ITR and transformer area. it is contain special detail for building and transfomert

  • Substation 2 (SS2-ITR 1& 2): (57 DWG + Calculation Notes + SAP2000) it is blast proof building, including ITR and transformer area. it is contain special detail for blast proof building according to SG-22 and ASCE.

  • Substation 3 (SS7): (36 DWG) it is non-blast proof building, including ITR and transformer area. it is contain special detail for.

  • Control Building: (20 DWG) it is blast proof building, and it contain special detail for blast proof building according to SG-22 and ASCE.

  • Substation 4 (SP19): (15 DWG) it is non-blast proof building, including ITR and transformer area. it is contain special detail for.




  •
 Marco7

Junior Member

Subscriber
United States
User ID: 164772
Joined: Feb 2015
Posts: 5
Threads: 1
Likes: 2 in 1 posts
Given Likes: 1
Points: -16 EP

#3
02-09-2023, 03:19 PM (This post was last modified: 02-09-2023, 11:43 PM by Dell_Brett.)
After I paid for this item (Unique package: Blast Proof...), how long is the waiting time frame to receive instructions to download it?
thank you,

MG

===================================
MODERATOR NOTE:

It is released as soon as the administrator has proof of the bank transfer.

Let's check what could be happening!




  •
 Administrator

CivilEA Founder

Administrators
United Nations
User ID: 1
Joined: Dec 2008
Posts: 3,202
Threads: 271
Likes: 21,082 in 2,339 posts
Given Likes: 4183
Points: 536,864 EP

#4
02-12-2023, 06:45 AM
(02-09-2023, 03:19 PM)Marco7 Wrote: After I paid for this item (Unique package: Blast Proof...), how long is the waiting time frame to receive instructions to download it?
thank you,

MG

===================================
MODERATOR NOTE:

It is released as soon as the administrator has proof of the bank transfer.

Let's check what could be happening!

Sorry for this issue.
Your payment was verified and you can download it now.



[-] The following 2 users Like Administrator 's post:2 users Like Administrator 's post
  • Dell_Brett, Marco7
« Next Oldest | Next Newest »

Users browsing this thread: 1 Guest(s)



Possibly Related Threads…
Thread Author Replies Views Last Post
  [CivilEA SHOP] Compressor Equipment (Dynamic Foundation) Package (Cal. Note, DWG, SAFE file & …) poolmand 0 3,615 05-26-2018, 11:03 AM
Last Post: poolmand
  [CivilEA SHOP] Blower (Dynamic & Static) Equipment Foundation Package (CN, DWG, SAFE file) poolmand 1 9,904 04-28-2018, 04:56 AM
Last Post: Administrator

  • View a Printable Version
  • Subscribe to this thread

Designed by CivilEA - Powered by MyBB

Linear Mode
Threaded Mode