10-11-2015, 11:15 AM
BAILEY BRIDGE
Size: 11 MB | Format: PDF | Quality: Scanner
Size: 11 MB | Format: PDF | Quality: Scanner
The Bailey bridge has several distinctive features. It is built by manpower alone. It is made entirely from prefabricated parts, the most notable of which are its light-steel panels linked by pinned joints. It is a ‘through-type bridge. And it can be moved from one site to another.
This manual is intended for use by engineer commanders, staff officers, combat engineers,and bridge specialists who are required to build the Bailey bridge.
Code:
***************************************
Content of this section is hidden, You must be registered and activate your account to see this content. See this link to read how you can remove this limitation:
http://forum.civilea.com/thread-27464.html
***************************************
Code:
***************************************
Content of this section is hidden, You must be registered and activate your account to see this content. See this link to read how you can remove this limitation:
http://forum.civilea.com/thread-27464.html
***************************************
Links replaced.
This post has been made by CivilEA Post-Generator V2.3.1