CivilEA.com
  • Subscribe !
  • Register
  • Login
  • Home
  • Members
  • Help
  • Search
Civil Engineering Association eBooks Structural Books Concrete FIB 48: Formwork and falsework for heavy construction

FIB 48: Formwork and falsework for heavy construction
 oscargon

Not-Activated

Nicaragua
User ID: 26134
Joined: Jul 2010
Posts: 26
Threads: 10
Likes: 396 in 26 posts
Given Likes: 212
Points:716 EP
#1
12-28-2013, 07:30 AM (This post was last modified: 04-04-2014, 03:34 PM by usman.)
FIB 48: Formwork and falsework for heavy construction

Author: fib Task Group 10.2 | Size: 8.59 MB | Format: PDF | Quality: Original preprint | Publisher: International Federation for Structural Concrete (fib) | Year: 2009 | pages: 96 | ISBN: 978-2-88394-088-8

[Image: 69237592135188736528.jpg]


[Image: info.png]

Abstract:

The realization process of civil engineering structures is complicated, involving a wide variety of disciplines, each of which brings a specific contribution. It is a challenge to structure the process so that a balanced, optimized participation of the many disciplines involved is achieved. One of the critical success factors is knowledge management: each discipline should bring professional knowledge, but they should interact at interfaces as well.

Temporary structures are an example of this phenomenon: they are right in the middle of a complex system of interactions between structural engineering, site engineering, work preparation, procurement, and execution. They have a significant impact on cost, construction time, construction methodology and the through-life performance of the actual structure.

Formwork and falsework are among the most important elements of temporary structures for civil engineering projects. Knowledge management with respect to formwork and falsework requires engineers to share knowledge and experience in the broadest sense, as the actual performance of formwork and falsework can only be evaluated at a late stage in the realization process, when some disciplines are no longer present. The learning circle can therefore only be closed through feedback.

fib Bulletin 48 presents an overview of formwork and falsework techniques and addresses issues related to the design and application thereof. Its objective is to bridge the gap often experienced in practice by effectively feeding back state of the art knowledge and experience with regard to formwork and falsework, thus making a larger group of engineers familiar with the important issues related to the design and application of formwork and falsework. It aims to provide both structural and site engineers with information to design and use formwork and falsework in a safe, reliable, and economic way, thus achieving better interaction between the engineering disciplines involved.

Bulletin 48 addresses some fundamental issues related to formwork and falsework:

- The appearance of the finished concrete, which is closely related to the quality of the formwork.
- The performance of the finished concrete in relation to durability and as part of Life Cycle Management.
- The need to support the concrete while it acquires enough strength and stiffness to support itself. In this context the most important issue is structural safety.

The guidelines given in this document are based on the experience of site and design engineers; and most of the advice is a consequence of real problems experienced in the past. Any warnings based solely on theoretical judgment have been avoided; only recommendations based on experience have been included.

fib Bulletin 48 focuses on principles only, and therefore does not address detailed design issues, for which local design codes should be applied.

[Image: download.png]
Code:
***************************************
Content of this section is hidden, You must be registered and activate your account to see this content. See this link to read how you can remove this limitation:

http://forum.civilea.com/thread-27464.html
***************************************


[Image: password.png]
Code:
***************************************
Content of this section is hidden, You must be registered and activate your account to see this content. See this link to read how you can remove this limitation:

http://forum.civilea.com/thread-27464.html
***************************************



This post has been made by CivilEA Post-Generator v2.2.0



[-] The following 27 users Like oscargon's post:27 users Like oscargon's post
  • pezhmankhan, milova, malc, chenamoy, blaze, fred2010, oanm2000, ting tsai huang, adhikarig, Dell_Brett, tang1942, dinu69in, Petrit, slowet, marion33, Badis, kuri, avge, draluka, ashcivilea, ikoleci, zrilek, mgdario, jfjdm, uvsrao61, Mohammad6299, apocalipse
 Mohammad6299

Not-Activated

Iran
User ID: 42302
Joined: Mar 2012
Posts: 869
Threads: 261
Likes: 7,912 in 854 posts
Given Likes: 4212
Points:59,515 EP
#2
04-03-2014, 07:58 AM
FIB 48: Formwork and falsework for heavy construction

Size: 9 MB | Format: PDF | Quality: Unspecified | Publisher: FIB - The International Federation for Structural Concrete (fédération internationale du béton) | Year: 2009 | Pages: 100 | ISBN: 9782883940888

[Image: 58805617379944089998.jpg]


[Image: info.png]

The realization process of civil engineering structures is complicated, involving a wide variety of disciplines, each of which brings a specific contribution. It is a challenge to structure the process so that a balanced, optimized participation of the many disciplines involved is achieved. One of the critical success factors is knowledge management: each discipline should bring professional knowledge, but they should interact at interfaces as well.

Temporary structures are an example of this phenomenon: they are right in the middle of a complex system of interactions between structural engineering, site engineering, work preparation, procurement, and execution. They have a significant impact on cost, construction time, construction methodology and the through-life performance of the actual structure.

Formwork and falsework are among the most important elements of temporary structures for civil engineering projects. Knowledge management with respect to formwork and falsework requires engineers to share knowledge and experience in the broadest sense, as the actual performance of formwork and falsework can only be evaluated at a late stage in the realization process, when some disciplines are no longer present. The learning circle can therefore only be closed through feedback.

fib Bulletin 48 presents an overview of formwork and falsework techniques and addresses issues related to the design and application thereof. Its objective is to bridge the gap often experienced in practice by effectively feeding back state of the art knowledge and experience with regard to formwork and falsework, thus making a larger group of engineers familiar with the important issues related to the design and application of formwork and falsework. It aims to provide both structural and site engineers with information to design and use formwork and falsework in a safe, reliable, and economic way, thus achieving better interaction between the engineering disciplines involved.

Bulletin 48 addresses some fundamental issues related to formwork and falsework:

The appearance of the finished concrete, which is closely related to the quality of the formwork.

The performance of the finished concrete in relation to durability and as part of Life Cycle Management.

The need to support the concrete while it acquires enough strength and stiffness to support itself. In this context the most important issue is structural safety.

The guidelines given in this document are based on the experience of site and design engineers; and most of the advice is a consequence of real problems experienced in the past. Any warnings based solely on theoretical judgment have been avoided; only recommendations based on experience have been included.

fib Bulletin 48 focuses on principles only, and therefore does not address detailed design issues, for which local design codes should be applied.

[Image: download.png]
Code:
***************************************
Content of this section is hidden, You must be registered and activate your account to see this content. See this link to read how you can remove this limitation:

http://forum.civilea.com/thread-27464.html
***************************************


[Image: mirror.png]
Code:
***************************************
Content of this section is hidden, You must be registered and activate your account to see this content. See this link to read how you can remove this limitation:

http://forum.civilea.com/thread-27464.html
***************************************


[Image: password.png]
Code:
***************************************
Content of this section is hidden, You must be registered and activate your account to see this content. See this link to read how you can remove this limitation:

http://forum.civilea.com/thread-27464.html
***************************************



This post has been made by CivilEA Post-Generator v2.2.0



[-] The following 19 users Like Mohammad6299's post:19 users Like Mohammad6299's post
  • slowet, marion33, avge, vvvv, malc, ting tsai huang, Andrew seah, warlord1, vardan, faros3000, arshiakh, PinkPant, Jackass, Dell_Brett, chenamoy, cristi, bridgeengineer, tumangik, psppsp
 arshiakh

Not-Activated

Iran
User ID: 37777
Joined: Dec 2011
Posts: 678
Threads: 100
Likes: 3,224 in 617 posts
Given Likes: 214
Points:27,526 EP
#3
04-04-2014, 09:16 AM


***************************************
Content of this section is hidden, You must be registered and activate your account to see this content. See this link to read how you can remove this limitation:

http://forum.civilea.com/thread-27464.html
***************************************




[-] The following 5 users Like arshiakh's post:5 users Like arshiakh's post
  • PinkPant, jocagalhao, we_mbm, ruaumoko, narendra
« Next Oldest | Next Newest »

Users browsing this thread: 1 Guest(s)



Possibly Related Threads…
Thread Author Replies Views Last Post
  Guide to flat slab formwork and falsework RyanRS 0 765 03-22-2016, 05:17 AM
Last Post: RyanRS
  FALSEWORK MANUAL triance 2 2,065 06-14-2012, 01:05 AM
Last Post: kowheng
  Design and Construction using insulating Concrete Formwork gboyega 0 1,864 08-25-2009, 07:21 AM
Last Post: gboyega

  • View a Printable Version
  • Subscribe to this thread

Designed by CivilEA - Powered by MyBB

Linear Mode
Threaded Mode