[Request] STRENGTHENING OF FOOTING
 knrsa

Semi Senior Member

Banned
White-private
User ID: 82
Joined: Dec 2008
Posts: 71
Threads: 42
Likes: 465 in 52 posts
Given Likes: 2171
Points:4,658 EP
#1
01-23-2013, 01:51 PM (This post was last modified: 01-26-2013, 09:46 AM by LiviuM.)
[Image: 49664901294296682291.jpg]
If any have sample calculations for strengthening of footing as shown in figure above.
Please share it.

thanks




  •
 ykhackhack

Not-Activated

United States
User ID: 36960
Joined: Nov 2011
Posts: 817
Threads: 81
Likes: 3,670 in 707 posts
Given Likes: 8693
Points:36,879 EP
#2
01-24-2013, 07:10 AM
@knrsa

Please indicate your problem with specifics. Like, what is the column size, load and footing size and loadings

The reason for the footing retrofit.

Level of detailing and calculations depend on these specifics.

If you have only one footing to repair, you would do it conservatively because the cost engineering time will exceed the repair cost

Or if you have too many of these footings , it might offset the engineering cost.

The location of these footings are also important, located at inside or outside of the building can effect the detail

Basically the detail / arrangement you are showing is correct.

Regards



[-] The following 1 user Likes ykhackhack's post:1 user Likes ykhackhack's post
  • LiviuM
 knrsa

Semi Senior Member

Banned
White-private
User ID: 82
Joined: Dec 2008
Posts: 71
Threads: 42
Likes: 465 in 52 posts
Given Likes: 2171
Points:4,658 EP
#3
01-24-2013, 03:15 PM
Dear ykhackhack
Thanks for reply to my quarry.
Reason was footings are designed for 300 kN/m², without investigation footings are casted. After investigation it is found that the actual SBC is 150 kN/m². Due to this eight number of footings required strengthening.
All footings are located inside the building.
Regards




  •
 ykhackhack

Not-Activated

United States
User ID: 36960
Joined: Nov 2011
Posts: 817
Threads: 81
Likes: 3,670 in 707 posts
Given Likes: 8693
Points:36,879 EP
#4
01-25-2013, 08:57 AM
@knrsa

We do these types of retrofit to the old foundations.

For example ,if we want to add another floor on top of an existing.

Please be more specific about the column and footing sizes and the loads also

What is the stage of the construction at the moment.
(By the way 300 kN/m^2 , which is more than 6000 psf is very dense soil)

Main design criteria here is to transfer shear and flexural forces ar intersection surfaces of old and new concrete.

Using epoxy bonding agent (like SIKA products, to bond old concrete to fresh concrete ) would make the design work better.
Regards



[-] The following 3 users Like ykhackhack's post:3 users Like ykhackhack's post
  • melekeen, oram, LiviuM
 knrsa

Semi Senior Member

Banned
White-private
User ID: 82
Joined: Dec 2008
Posts: 71
Threads: 42
Likes: 465 in 52 posts
Given Likes: 2171
Points:4,658 EP
#5
01-25-2013, 11:58 AM
Dear ykhackhack
If you have sample calculation notes please share. Hope I have given you the all information
you required.
Thanks&Regards



[-] The following 1 user Likes knrsa's post:1 user Likes knrsa's post
  • ykhackhack
 learner20

Member

Banned
India
User ID: 20770
Joined: May 2010
Posts: 48
Threads: 23
Likes: 100 in 29 posts
Given Likes: 1933
Points:2,964 EP
#6
01-25-2013, 04:22 PM
Hello knrsa
Try finding books related to retrofitting/repair especially column and footing jacketing
I feel jacketing is the option , but you need to provide the building plan with all columns+plus all loads so that expert here can try to find the solution
Bye



[-] The following 1 user Likes learner20's post:1 user Likes learner20's post
  • ykhackhack
 88FeNIX

Not-Activated

Pakistan
User ID: 24521
Joined: Jun 2010
Posts: 79
Threads: 39
Likes: 229 in 52 posts
Given Likes: 303
Points:4,598 EP
#7
02-21-2013, 11:31 AM (This post was last modified: 02-21-2013, 12:26 PM by BennyP.)
Dear knrsa,
There are only two main considerations Flexure and Shear.
You just need to focus that the additional shear and flexure is catered by making sure that a perfect connection exists between old and new footing.

I have attached an image of detailing. Hope it helps as I dont have the calculations right now.
[Image: 79970164551988683733_thumb.jpg]

Moderator note:

Your image realy help. Try to learn how to post the uploaded image if you want someone see it without effort.


[Image: 79970164551988683733.jpg]



[-] The following 4 users Like 88FeNIX's post:4 users Like 88FeNIX's post
  • sodapas, malc, knrsa, ykhackhack
« Next Oldest | Next Newest »

Users browsing this thread: 1 Guest(s)



  • View a Printable Version
  • Subscribe to this thread

Designed by CivilEA - Powered by MyBB

Linear Mode
Threaded Mode