CivilEA.com
  • Subscribe !
  • Register
  • Login
  • Home
  • Members
  • Help
  • Search
Civil Engineering Association eBooks Project Management Preliminary Engineering Cost Trends for Highway Projects

Preliminary Engineering Cost Trends for Highway Projects
 mahyarov

Not-Activated

Iran
User ID: 1197
Joined: Apr 2009
Posts: 530
Threads: 451
Likes: 3,226 in 534 posts
Given Likes: 1492
Points:47,728 EP
#1
10-29-2012, 06:57 AM
Concrete Delivery Time Study

Author: Liu, Min Hummer, Joseph E Rasdorf, William J Hollar, Donna A Parikh, Shalin C Lee, Jiyong Gopinath, Sathyanarayana | Size: 4.17 MB | Format: PDF | Quality: Original preprint | Publisher: North Carolina State University, Raleigh | Year: 2011 | pages: 133

[Image: 68667722494952835401.png]


[Image: info.png]

Preliminary engineering (PE) for a highway project encompasses two efforts: planning to minimize the physical, social, and human environmental impacts of projects and engineering design to deliver the best alternative. PE efforts begin years in advance of the project's construction letting, often five years or more. An efficient and accurate method to estimate PE costs would benefit transportation departments. Typically, departments estimate PE costs as a percentage of construction costs disregarding other project-specific parameters. By analyzing 461 North Carolina Department of Transportation bridge projects and 188 roadway projects let between 2001 through 2009, the research team developed statistical models linking variation in PE costs and PE duration with distinctive project parameters. The development of a user interface application aids agency users in executing the models to predict a project's PE cost ratio. Modeling strategies included multiple linear regression, hierarchical linear models, Dirichlet process linear models, and multilevel Dirichlet process linear models (MDPLM). The 461 bridge projects exhibited a mean PE cost ratio of 27.8% (ratio of PE cost over estimated construction cost) and a mean PE duration of 66.1 months. Mean PE cost ratio for the 188 roadway projects was 11.7% with a mean PE duration of 55.1 months. Project parameters utilized in the predictive models included project scope classification such as widening or new location, dimensional variables (project length, structure length, detour length, and number of spans); geographical region; and estimated costs for construction and right of way. The MDPLM minimized the mean absolute prediction error for bridges' PE cost ratio, but interpretation of variable effects and sensitivity is difficult because of the multilevel structure. Regression modeling results are also reported since sensitivity interpretation from them is more direct.

[Image: download.png]
Code:
***************************************
Content of this section is hidden, You must be registered and activate your account to see this content. See this link to read how you can remove this limitation:

http://forum.civilea.com/thread-27464.html
***************************************


This post has been made by CivilEA Post-Generator ver 2.1.6



[-] The following 4 users Like mahyarov's post:4 users Like mahyarov's post
  • blaze, cace-01, Jackass, moh_towhid
« Next Oldest | Next Newest »

Users browsing this thread: 1 Guest(s)



Possibly Related Threads…
Thread Author Replies Views Last Post
  Contracting for Engineering and Construction Projects, 5th Edition ibg0203 0 700 10-07-2015, 04:06 PM
Last Post: ibg0203
  Spon's Civil Engineering and Highway Works Price Book 2012 asim99 1 1,249 02-22-2014, 03:09 PM
Last Post: Mohammad6299
  Integrated Cost and Schedule Control for Construction Projects asim99 1 1,411 12-23-2013, 07:44 AM
Last Post: cosmic_fighter
  No More Muddling Through: Mastering Complex Projects in Engineering and Management cargadory2k 1 1,194 03-10-2013, 08:19 PM
Last Post: arshiakh
  The Strategic Management of Large Engineering Projects oanm2000 2 1,597 03-09-2013, 02:02 PM
Last Post: arshiakh
  Spon's Civil Engineering and Highway Works Price Book 2004>>By Davis Langdon & Everes cordoba123 2 1,727 03-04-2013, 06:02 AM
Last Post: arshiakh
  Procedures Guide for Right-of-Way Cost Estimation and Cost Management mahyarov 0 959 10-23-2012, 04:41 PM
Last Post: mahyarov

  • View a Printable Version
  • Subscribe to this thread

Designed by CivilEA - Powered by MyBB

Linear Mode
Threaded Mode