CivilEA.com
  • Subscribe !
  • Register
  • Login
  • Home
  • Members
  • Help
  • Search
Civil Engineering Association eBooks Geotechnical Engineering Foundation & Geotechnics in general Performance of a Pile-Supported Embankment

Performance of a Pile-Supported Embankment
 mahyarov

Not-Activated

Iran
User ID: 1197
Joined: Apr 2009
Posts: 530
Threads: 451
Likes: 3,226 in 534 posts
Given Likes: 1492
Points:47,728 EP
#1
10-27-2012, 08:42 PM
Performance of a Pile-Supported Embankment

Author: Hoppe, Edward J | Size: 1.15 MB | Format: PDF | Quality: Original preprint | Publisher: Virginia Transportation Research Council | Year: 2006 | pages: 30

[Image: 12089069932560589954.png]


[Image: info.png]

The purpose of this study was to evaluate the field performance of the first pile-supported highway embankment constructed in Virginia. The project involved construction of an approach to the new bridge over the Mattaponi River, replacing the existing Lord Delaware Bridge at West Point. The scope of work included field instrumentation and data gathering as related to stress transfer and settlement. The objective was to measure actual soil pressures that are exerted at the geotextile fabric bridging pile caps and to measure stresses acting over pile caps. In addition, data analysis was to be carried out to provide information that Virginia Department of Transportation (VDOT) engineers could use to optimize future designs of pile-supported embankments. This report contains field monitoring data and analysis. Prestressed concrete piles were driven at 7-ft (2.1 m) spacing and topped with 3 ft by 3 ft (0.9 m by 0.9 m) precast concrete pile caps. Several layers of high-strength geosynthetic fabric were used for base reinforcement. The maximum embankment height was approximately 6 ft (1.8 m). Earth pressure sensors installed onsite confirmed the formation of soil arching in the embankment fill between columns. Numerical analysis pointed to the large impact of the upper foundation soil layer properties on the magnitude of the final embankment settlement and fabric strain. This shows that accurate material characterization is essential for a cost-effective design. Construction of the pile-supported embankment was carried out by a general contractor. No specialized equipment or methods were required. A rapid increase in the subgrade bearing capacity was observed as the construction proceeded. This method appears particularly well suited to time-critical projects.

[Image: download.png]
Code:
***************************************
Content of this section is hidden, You must be registered and activate your account to see this content. See this link to read how you can remove this limitation:

http://forum.civilea.com/thread-27464.html
***************************************


This post has been made by CivilEA Post-Generator ver 2.1.6



[-] The following 6 users Like mahyarov's post:6 users Like mahyarov's post
  • Evandrojr, Dell_Brett, cace-01, kowheng, oanm2000, rizal13
« Next Oldest | Next Newest »

Users browsing this thread: 1 Guest(s)



Possibly Related Threads…
Thread Author Replies Views Last Post
  Geotechnical Engineering of Embankment Dams ELAHI1979 7 3,238 10-08-2015, 08:15 AM
Last Post: emmi
  GEOTECHNICAL PERFORMANCE OF A HIGHWAY EMBANKMENT CONSTRUCTED USING WASTE FOUNDRY SAND mahyarov 0 749 10-28-2012, 06:07 AM
Last Post: mahyarov
  ON INTERNAL EROSION IN EMBANKMENT DAMS tuanpecc1 4 1,844 09-05-2012, 06:50 AM
Last Post: shadabg
  NYDOT: GUIDELINES FOR EMBANKMENT CONSTRUCTION tuanpecc1 0 1,100 10-16-2010, 01:35 PM
Last Post: tuanpecc1

  • View a Printable Version
  • Subscribe to this thread

Designed by CivilEA - Powered by MyBB

Linear Mode
Threaded Mode