CivilEA.com
  • Subscribe !
  • Register
  • Login
  • Home
  • Members
  • Help
  • Search
Civil Engineering Association eBooks Project Management Project Management with Dynamic Scheduling >> By Mario Vanhoucke

Project Management with Dynamic Scheduling >> By Mario Vanhoucke
 cordoba123

Not-Activated

Afghanistan
User ID: 1196
Joined: Apr 2009
Posts: 485
Threads: 221
Likes: 5,490 in 485 posts
Given Likes: 1618
Points:49,486 EP
#1
02-19-2012, 10:20 PM (This post was last modified: 02-19-2012, 10:22 PM by cordoba123.)
Project Management with Dynamic Scheduling (Baseline Scheduling, Risk Analysis and Project Control) >> By Mario Vanhoucke

Author: Mario Vanhoucke | Size: zip 3.76 MB | Format: PDF | Quality: Original preprint | Publisher: Springer | Year: 2012 | pages: 314 | ISBN: 978-3-642-25174-0

[Image: 37024392476903789063.jpg]


[Image: info.png]

Overview of project scheduling principles available in literature
Integration of scheduling, risk and control
Use of software stimulated (student version available)
Topics based on many research projects and reallife projects

The topic of this book is known as dynamic scheduling, and is used to refer to three dimensions of project management and scheduling: the construction of a baseline schedule and the analysis of a project schedule’s risk as preparation of the project control phase during project progress. This dynamic scheduling point of view implicitly assumes that the usability of a project’s baseline schedule is rather limited and only acts as a point of reference in the project life cycle. Consequently, a project schedule should especially be considered as nothing more than a predictive model that can be used for resource efficiency calculations, time and cost risk analyses, project tracking and performance measurement, and so on. In this book, the three dimensions of dynamic scheduling are highlighted in detail and are based on and inspired by a combination of academic research studies at Ghent University
Code:
***************************************
Content of this section is hidden, You must be registered and activate your account to see this content. See this link to read how you can remove this limitation:

http://forum.civilea.com/thread-27464.html
***************************************
in-company trainings at Vlerick Leuven Gent Management School
Code:
***************************************
Content of this section is hidden, You must be registered and activate your account to see this content. See this link to read how you can remove this limitation:

http://forum.civilea.com/thread-27464.html
***************************************
and consultancy projects at OR-AS
Code:
***************************************
Content of this section is hidden, You must be registered and activate your account to see this content. See this link to read how you can remove this limitation:

http://forum.civilea.com/thread-27464.html
***************************************
First, the construction of a project baseline schedule is a central theme throughout the various chapters of the book, and is discussed from a complexity point of view with and without the presence of project resources. Second, the creation of an awareness of the weak parts in a baseline schedule is discussed at the end of the two baseline scheduling parts as schedule risk analysis techniques that can be applied on top of the baseline schedule. Third, the baseline schedule and its risk analyses can be used as guidelines during the project control step where actual deviations can be corrected within the margins of the project’s time and cost reserves.

[Image: download.png]
Code:
***************************************
Content of this section is hidden, You must be registered and activate your account to see this content. See this link to read how you can remove this limitation:

http://forum.civilea.com/thread-27464.html
***************************************


[Image: mirror.png]
Code:
***************************************
Content of this section is hidden, You must be registered and activate your account to see this content. See this link to read how you can remove this limitation:

http://forum.civilea.com/thread-27464.html
***************************************


[Image: password.png]
Code:
***************************************
Content of this section is hidden, You must be registered and activate your account to see this content. See this link to read how you can remove this limitation:

http://forum.civilea.com/thread-27464.html
***************************************

This post has been made by CivilEA Post-Generator ver 2.1.6



[-] The following 13 users Like cordoba123's post:13 users Like cordoba123's post
  • Dell_Brett, kowheng, portal61, eliseo.as, rkce, Jackass, oanm2000, yutt, zrilek, tluc, lancelee123, hp_logger, malc
« Next Oldest | Next Newest »

Users browsing this thread: 1 Guest(s)



Possibly Related Threads…
Thread Author Replies Views Last Post
  Project Management for Construction ska51 7 4,304 02-19-2025, 05:58 AM
Last Post: poolmand
  A Guide to the Project Management Body of Knowledge: PMBOK asim99 8 4,101 03-23-2024, 01:04 PM
Last Post: babakfeyzi
  Construction Project Scheduling and Control Dell_Brett 2 1,890 12-16-2018, 05:11 PM
Last Post: carolinandra
  Project Management Case Studies axcel 1 900 05-08-2018, 11:54 PM
Last Post: rami1976
  Case Studies in Project, Program, and Organizational Project Management Learner 4 2,698 11-05-2017, 07:36 AM
Last Post: mosesgrace
  Effective Project Management:Traditional, Agile, Extreme joinsms 1 981 11-05-2017, 07:30 AM
Last Post: mosesgrace
  Project Management for Facility Constructions hmaida2008 4 2,083 03-30-2017, 08:43 PM
Last Post: gulilero

  • View a Printable Version
  • Subscribe to this thread

Designed by CivilEA - Powered by MyBB

Linear Mode
Threaded Mode