ACI SPEC-351.5-15 & 351.5M: Epoxy Grout Installation between Foundations and Equipment Bases—Specification
| Size: 8.19 MB| Format: PDF| Quality: Scanner| Year: 2015
![[Image: 99874359503813685781.jpg]](https://pic.civilea.com/images/99874359503813685781.jpg)
![[Image: 43136123871980051379.jpg]](https://pic.civilea.com/images/43136123871980051379.jpg)
This Specification covers minimum requirements for installing epoxy grouting between foundations and equipment bases. Included are requirements for materials, placement, forming, testing, repair, and quality control. A mandatory requirements checklist and an optional requirements checklist are provided to assist the Architect/Engineer in supplementing the requirements of this Specification as required or needed by designating or specifying individual project requirements.
Keywords:
cement grout; cementitious grout; epoxy grout; equipment grout; foundations; grout.
Code:
Content of this section is hidden, You must be registered and upgrade your account to see this content.See this link to read how you can remove this limitation:
👉 CLICK HERE 👈
Code:
Content of this section is hidden, You must be registered and upgrade your account to see this content.See this link to read how you can remove this limitation:
👉 CLICK HERE 👈
Code:
Content of this section is hidden, You must be registered and upgrade your account to see this content.See this link to read how you can remove this limitation:
👉 CLICK HERE 👈
This post has been made by CivilEA Post-Generator V2.4.4


![[-]](https://forum.civilea.com/images/collapse.png)