Dear members,
can someone upload this article
Authors:
LIU Chun,LU Jia-zheng,CHEN Hong-dong(Hunan Electric Power Test and Research Institute,Changsha 410007,China)
Abstract
The tower falling down in Hunan 500kV Fusha lineβ is modeled by large universal finite element software ANSYS,the ultimate load-carrying capacity of tower is calculated as the variation of the thickness of line ice accretion,and the cause of the tower falling down is analyzed.According to calculation result,two partial strengthen projects are calculated and checked,and countermeasures are suggested.
Link:
π½π½π½π½π½π½π½π½π½
See this link to read how you can remove this limitation:
π CLICK HERE π
With regards,
apocalipse
can someone upload this article
Cause analysis of tower falling down and ice accretion in Hunan 500kV power transmission line
Authors:
LIU Chun,LU Jia-zheng,CHEN Hong-dong(Hunan Electric Power Test and Research Institute,Changsha 410007,China)
Abstract
The tower falling down in Hunan 500kV Fusha lineβ is modeled by large universal finite element software ANSYS,the ultimate load-carrying capacity of tower is calculated as the variation of the thickness of line ice accretion,and the cause of the tower falling down is analyzed.According to calculation result,two partial strengthen projects are calculated and checked,and countermeasures are suggested.