Project Management with Dynamic Scheduling (Baseline Scheduling, Risk Analysis and Project Control) >> By Mario Vanhoucke
Author: Mario Vanhoucke | Size: zip 3.76 MB | Format: PDF | Quality: Original preprint | Publisher: Springer | Year: 2012 | pages: 314 | ISBN: 978-3-642-25174-0
![[Image: 37024392476903789063.jpg]](https://pic.civilea.com/images/37024392476903789063.jpg)
Overview of project scheduling principles available in literature
Integration of scheduling, risk and control
Use of software stimulated (student version available)
Topics based on many research projects and reallife projects
The topic of this book is known as dynamic scheduling, and is used to refer to three dimensions of project management and scheduling: the construction of a baseline schedule and the analysis of a project scheduleβs risk as preparation of the project control phase during project progress. This dynamic scheduling point of view implicitly assumes that the usability of a projectβs baseline schedule is rather limited and only acts as a point of reference in the project life cycle. Consequently, a project schedule should especially be considered as nothing more than a predictive model that can be used for resource efficiency calculations, time and cost risk analyses, project tracking and performance measurement, and so on. In this book, the three dimensions of dynamic scheduling are highlighted in detail and are based on and inspired by a combination of academic research studies at Ghent University
Code:
Content of this section is hidden, You must be registered and activate your account to see this content.See this link to read how you can remove this limitation:
π CLICK HERE π in-company trainings at Vlerick Leuven Gent Management School
Code:
Content of this section is hidden, You must be registered and activate your account to see this content.See this link to read how you can remove this limitation:
π CLICK HERE π and consultancy projects at OR-AS
Code:
Content of this section is hidden, You must be registered and activate your account to see this content.See this link to read how you can remove this limitation:
π CLICK HERE π First, the construction of a project baseline schedule is a central theme throughout the various chapters of the book, and is discussed from a complexity point of view with and without the presence of project resources. Second, the creation of an awareness of the weak parts in a baseline schedule is discussed at the end of the two baseline scheduling parts as schedule risk analysis techniques that can be applied on top of the baseline schedule. Third, the baseline schedule and its risk analyses can be used as guidelines during the project control step where actual deviations can be corrected within the margins of the projectβs time and cost reserves.
Code:
Content of this section is hidden, You must be registered and activate your account to see this content.See this link to read how you can remove this limitation:
π CLICK HERE π
Code:
Content of this section is hidden, You must be registered and activate your account to see this content.See this link to read how you can remove this limitation:
π CLICK HERE π
Code:
Content of this section is hidden, You must be registered and activate your account to see this content.See this link to read how you can remove this limitation:
π CLICK HERE π


![[-]](https://forum.civilea.com/images/collapse.png)