Code:
Content of this section is hidden, You must be registered and activate your account to see this content.See this link to read how you can remove this limitation:
👉 CLICK HERE 👈
|
Code: Content of this section is hidden, You must be registered and activate your account to see this content.See this link to read how you can remove this limitation: 👉 CLICK HERE 👈 AS 3850—2003 Tilt-up concrete construction Size: 0.8 MB | Format: PDF | Publisher: Standards Australia | Year: 2003 | pages: 65 | ISBN: 0 7337 5337 X
![]() This Standard was prepared by the Standards Australia Committee BD-066, Tilt-up Construction, to supersede AS 3850.1—1990, Tilt-up concrete and precast concrete elements for use in buildings Part 1: Safety requirements, AS 3850.2—1990, Tilt-up concrete and precast concrete elements for use in buildings Part 2: Guide to design, casting and erection of tilt-up panels and AS 3850.3—1992 Tilt-up concrete and precast concrete elements for use in buildings Part 3: Guide to the erection of precast concrete members in response to the call from industry to update them and regulatory authorities to expand the requirements relating to safety. The Standard is to be read in conjunction with AS 3600, Concrete structures. Although the Standard has been written primarily to address the construction of concrete buildings using ‘tilt-up’ panels, the rules may be appropriate for other forms of precast concrete construction. A ‘Tilt-up’ panel is defined as ‘an essentially flat concrete panel; cast in a horizontal position, usually on-site; initially lifted by rotation about one edge until in a vertical or near-vertical position; transported and lifted into position if necessary; and then stabilized by bracing members until incorporated into the final structure’. The terms ‘normative’ and ‘informative’ have been used in this Standard to define the application of the appendix to which they apply. A ‘normative’ appendix is an integral part of a Standard, whereas an ‘informative’ appendix is only for information and guidance. In the Standard where the word ‘shall’ is used a mandatory requirement is implied and where the word ‘should’ is used the requirement is advisory. Code: Content of this section is hidden, You must be registered and activate your account to see this content.See this link to read how you can remove this limitation: 👉 CLICK HERE 👈 Made By CivilEA Post-Generator ver 2.1[/i][/url][/size][/align]
concrete solution advocate
The following 6 users Like concreteok's post:• oanm2000, lasalleguy, zrilek, Trishu999, sivlad, tarekfarah |
| Possibly Related Threads… | |||||
| Thread | Author | Replies | Views | Last Post | |
| Code of Practice for Precast Concrete Construction - 2003 - Hongkong | ir_71 | 2 | 4,144 |
09-18-2013, 02:39 PM Last Post: ssobhan |
|