Dear Yahackhack,
I have a five story building with ground floor and substructure of concrete and steel structure from first floor to fifth floor (Roof). Ground floor ceiling concrete slab is to act as transfer slab. Steel column loading's from first floor and above loading to be transferred to concrete transfer slab.
I have a five story building with ground floor and substructure of concrete and steel structure from first floor to fifth floor (Roof). Ground floor ceiling concrete slab is to act as transfer slab. Steel column loading's from first floor and above loading to be transferred to concrete transfer slab.