04-28-2012, 11:56 AM
Usually stadium have a long span cantilever roof with a space truss system (20-40 meters), The suplier support the calculation and design of all element of the roof (ie: truss, ball joint, etc).
They will send to consultant the reaction support of the space truss roof.
For concrete frame stadium, I think is not a big problem for you.
They will send to consultant the reaction support of the space truss roof.
For concrete frame stadium, I think is not a big problem for you.