Civil Engineering Association

Full Version: ACI PRC-325.13-25: Concrete Overlays for Pavement Rehabilitation
You're currently viewing a stripped down version of our content. View the full version with proper formatting.
ACI PRC-325.13-25: Concrete Overlays for Pavement Rehabilitation—Report

Author(s)/Editor(s): ACI Committee 325 | Size: 5.57 MB| Format: PDF| Quality: Scanner| Year: 2025| pages: 31 | ISBN: 9781641953368


[Image: do.php?img=15]


[Image: info.png]

This report provides information on the use of both bonded and unbonded concrete overlay solutions for the rehabilitation of concrete and asphalt pavements. Information is provided on the characteristics of each overlay type along with important design and construction considerations. Critical considerations are provided for the selection of the appropriate overlay type to meet the needs and condition of the project.

Keywords:

bonded; concrete overlay; construction; design; performance; rehabilitation; unbonded.

[Image: download.png]
Code:
***************************************
Content of this section is hidden, You must be registered and activate your account to see this content. See this link to read how you can remove this limitation:

http://forum.civilea.com/thread-27464.html
***************************************


[Image: mirror.png]
Code:
***************************************
Content of this section is hidden, You must be registered and activate your account to see this content. See this link to read how you can remove this limitation:

http://forum.civilea.com/thread-27464.html
***************************************


[Image: password.png]
Code:
***************************************
Content of this section is hidden, You must be registered and activate your account to see this content. See this link to read how you can remove this limitation:

http://forum.civilea.com/thread-27464.html
***************************************



This post has been made by CivilEA Post-Generator V2.4.4