10-25-2011, 02:09 AM
Hi all
Can someone sure me that in the paper "Design and construction of Incheon bridge CSB pylon", the contractor used a heavy lifting floating crane during the installation of horizontal member (Figure 6 in the paper). Thx
DE
Can someone sure me that in the paper "Design and construction of Incheon bridge CSB pylon", the contractor used a heavy lifting floating crane during the installation of horizontal member (Figure 6 in the paper). Thx
DE