11-21-2015, 06:36 AM
The structural design of Almas Tower, Dubai, UAE
![[Image: 36260102373496123645.jpg]](https://pic.civilea.com/images/36260102373496123645.jpg)
Abstract: Introduction
The Dubai Multi Commodity Centreβs Almas Tower is a 360m high slender office tower located in the Jumeirah Lake Towers development in Dubai,United Arab Emirates (UAE) . The building consists of five basements, two podium levels,60 storeys of offices and three mechanical floors. It has a total floor area of approximately 85,000mΒ².
A typical tower floor plan is in the form of two diagonally offset ellipses, with a floor plate approximately 64m long and 42m wide . The floor plan from level 53 to level 64 consists of only one of
the two ellipses. An 81m slender spire peaks at 360m, forming the
highest point in the development.
The building was completed in September 2008 and according
to the Council for Tall Buildings and Urban Habitat (CTBUH),
was the worldβs second tallest building completed that year.
![[Image: download.png]](http://postgen.civilea.com/icon/download.png)
π½π½π½π½π½π½π½π½π½
See this link to read how you can remove this limitation:
π CLICK HERE π
![[Image: password.png]](http://postgen.civilea.com/icon/password.png)
π½π½π½π½π½π½π½π½π½
See this link to read how you can remove this limitation:
π CLICK HERE π
This post has been made by CivilEA Post-Generator V2.3.1
![[Image: 36260102373496123645.jpg]](https://pic.civilea.com/images/36260102373496123645.jpg)
- Size: 0.3 MB
- Quality: Original preprint
The Dubai Multi Commodity Centreβs Almas Tower is a 360m high slender office tower located in the Jumeirah Lake Towers development in Dubai,United Arab Emirates (UAE) . The building consists of five basements, two podium levels,60 storeys of offices and three mechanical floors. It has a total floor area of approximately 85,000mΒ².
A typical tower floor plan is in the form of two diagonally offset ellipses, with a floor plate approximately 64m long and 42m wide . The floor plan from level 53 to level 64 consists of only one of
the two ellipses. An 81m slender spire peaks at 360m, forming the
highest point in the development.
The building was completed in September 2008 and according
to the Council for Tall Buildings and Urban Habitat (CTBUH),
was the worldβs second tallest building completed that year.
Code:
Content of this section is hidden, You must be registered and upgrade your account to see this content.See this link to read how you can remove this limitation:
π CLICK HERE π
Code:
Content of this section is hidden, You must be registered and upgrade your account to see this content.See this link to read how you can remove this limitation:
π CLICK HERE π
This post has been made by CivilEA Post-Generator V2.3.1


![[-]](https://forum.civilea.com/images/collapse.png)