ASTM - User's Guide to ASTM Specification C94 on Ready-Mixed Concrete - Printable Version +- Civil Engineering Association (https://forum.civilea.com) +-- Forum: eBooks (https://forum.civilea.com/forum-63.html) +--- Forum: Codes, Manual & Handbook (https://forum.civilea.com/forum-16.html) +---- Forum: ASTM (https://forum.civilea.com/forum-127.html) +---- Thread: ASTM - User's Guide to ASTM Specification C94 on Ready-Mixed Concrete (/thread-16581.html) |
ASTM - User's Guide to ASTM Specification C94 on Ready-Mixed Concrete - ibg0203 - 09-16-2010 User's Guide to ASTM Specification C94
on
Ready-Mixed Concrete
User's Guide to ASTM Specification C94 on Ready-Mixed Concrete (ASTM Manual) (Astm Manual Series, Mnl 49) By D. Gene Daniel; Colin L. Lobo Publisher: ASTM International Number Of Pages: 130 Publication Date: 2005-01-01 ISBN-10 / ASIN: 0803133634 ISBN-13 / EAN: 9780803133631 Product Description: ASTM C 94 covers the complex subject of ready-mixed concrete. This manual, co-published by ASTM International and the National Ready-Mixed Concrete Association, provides a complete and detailed explanation of C 94's uses and applications. It cuts through the broad language of the standard by using straightforward explanations and examples. Twenty comprehensive chapters plus an overview cover: • Background of ASTM C 94/C 94M • Scope • Referenced Documents • Basis of Purchase • Ordering Information • Materials • Tolerances in Slump • Air-Entrained Concrete • Measuring Materials • Batching Plant • Mixers and Agitators • Mixing and Delivery • Uses of Nonagitating Equipment • Batch Ticket Information • Plant Inspection • Practices, Test Methods, and Reporting • Sampling and Testing Fresh Concrete • Failure to Meet Strength Requirements • Keywords • Annex of Mandatory Information Contents Preface Introduction Chapter 1--Scope Chapter 2--Referenced Documents Chapter 3--Basis of Purchase Chapter 4reOrdering Information Chapter 5--Materials Chapter 6--Tolerances in Slump Chapter 7--Air-Entrained Concrete Chapter 8--Measuring Materials Chapter 9--Batching Plant Chapter 10mMixers and Agitators Chapter 11 ~Mixing and Delivery Chapter 12--Use of Nonagitating Equipment Chapter 13~Batch Ticket Information Chapter 14--Plant Inspection Chapter 15--Practices, Test Methods, and Reporting Chapter 16~Sampling and Testing Fresh Concrete Chapter 17~Strength Chapter 18--Failure to Meet Strength Requirements Chapter 19~Keywords Chapter 20~Annex (Mandatory Information) References Appendix--ASTM C 94-35 Code: *************************************** password for ifile link only, other links none Code: *************************************** RE: User's Guide to ASTM Specification C94 on Ready-Mixed Concret - kowheng - 12-09-2010 Mirror Links: Bookmark PDF|RAR 5.19|4.94 MB Code: *************************************** |