Civil Engineering Association
SPP Pile Driving Record Using JRA Specs - Printable Version

+- Civil Engineering Association (https://forum.civilea.com)
+-- Forum: Civil Engineering Resource (https://forum.civilea.com/forum-1.html)
+--- Forum: Civil Engineering Documents (https://forum.civilea.com/forum-89.html)
+---- Forum: Calculation Notes & Analysis Files (https://forum.civilea.com/forum-80.html)
+---- Thread: SPP Pile Driving Record Using JRA Specs (/thread-14708.html)



SPP Pile Driving Record Using JRA Specs - lednar_ved - 07-29-2010

SPP Pile Driving Record Using JRA Specifications

[Image: info.png]
A sample pile driving record using the MODIFIED HILEY's FORMULA for the Steel Pipe Pile Foundation of Bridge Abutment.
Name of Bridge: Ihawan Bridge
Location: Philippines
Superstructure: AASHTO PC Girder
Substructure: SPP Foundation
Length of Bridge: 114.9m
No. of Span: 3

File Format: PDF
No. of Pages: 1

[Image: screen.png]
[Image: 67453960566326673847.jpg]

[Image: Download.png]

Code:
***************************************
Content of this section is hidden, You must be registered and activate your account to see this content. See this link to read how you can remove this limitation:

http://forum.civilea.com/thread-27464.html
***************************************

[Image: password.png]

Code:
***************************************
Content of this section is hidden, You must be registered and activate your account to see this content. See this link to read how you can remove this limitation:

http://forum.civilea.com/thread-27464.html
***************************************



RE: SPP Pile Driving Record Using JRA Specs - Nilupa - 04-11-2011

Dead Link. Please re-upload if possible.
Best Regards !


RE: SPP Pile Driving Record Using JRA Specs - jpver - 07-15-2011

Hi Nilupa,

From the original post, right click and save the file. It is a jpeg file and only 1 page.