Civil Engineering Association
Discussion about the base isolation design - Printable Version

+- Civil Engineering Association (https://forum.civilea.com)
+-- Forum: Civil Engineering Resource (https://forum.civilea.com/forum-1.html)
+--- Forum: Civil Engineering Documents (https://forum.civilea.com/forum-89.html)
+---- Forum: Calculation Notes & Analysis Files (https://forum.civilea.com/forum-80.html)
+---- Thread: Discussion about the base isolation design (/thread-12927.html)



Discussion about the base isolation design - tibas - 06-10-2010

Dear all,
I want to open a new thread to discuss the calcul and designing of the buildings with seismic isolation devices.
We all know the procedure to start this study:

1/ Predimensioning the device (isolator devices);
2/ input the numerical model;
3/ Analysis of Results and verification

Discuss for threes last procedure
How predimensioning the device?
How input the numerical model?
What code or condition to Analysis of Results and verification?




Let us discuss it.

Best Regards.


RE: Discussion about the base isolation design - fretts08 - 06-14-2010

Question: What's the most suitable height or the maximum height where seismic isolation devices are most suitable?:laie_14:
Question: What's the most suitable height or the maximum height of a building where seismic isolation devices are most suitable for foundations?Laie_14


RE: Discussion about the base isolation design - kowheng - 06-15-2010

For someone who interested in "3D-BASIS: Nonlinear Dynamic Analysis of Three Dimensional Base Isolated Structures"

Go to this thread:
Code:
***************************************
Content of this section is hidden, You must be registered and activate your account to see this content. See this link to read how you can remove this limitation:

http://forum.civilea.com/thread-27464.html
***************************************