Civil Engineering Association

Full Version: CSA W59.2: Welded aluminum construction
You're currently viewing a stripped down version of our content. View the full version with proper formatting.
CSA W59.2:18 (R2023): Welded aluminum construction

| Size: 36.82 MB| Format: PDF| Quality: Scanner| Year: 2023


[Image: 62291690625352434268.jpg]


[Image: info.png]

This is the second edition of CSA Standard W59.2, Welded aluminum construction. It supersedes the previous edition published in 1991 and CSA 5244-1969, Welded Design and Workmanship (Inert Gas Shielded Arc Processes), which was replaced by the 1991 edition.

This edition represents a major rework of the Standard in both format and content. The following is a brief description of some of the most significant changes to the current edition of CSA W59.2:

• the structure of this Standard has been modified to parallel CSA W59 where appropriate for ease of use;

• Clause 3 has been revised to add several new materials;

• Clause 5 includes new requirements for weld acceptance criteria;

• Clause 7 has been reworked to provide clarity on roles and responsibilities for welding inspection;

• Clause 8 has been added to provide comprehensive requirements for non-destructive testing;

• Clause 10 has been added to provide requirements for friction stir welding; and

• Annex A has been added to provide recommended joint geometries for aluminum welding.

This Standard was prepared by the Technical Committee on Welding of Bridges, Buildings, and Machinery and the Offshore Welding Task Group, under the jurisdiction of the Strategic Steering Committee on Construction and Civil Infrastructure, and has been formally approved by the Technical Committee.

This Standard has been developed in compliance with Standards Council of Canada requirements for National Standards of Canada. It has been published as a National Standard of Canada by CSA Group.

[Image: download.png]
Code:
***************************************
Content of this section is hidden, You must be registered and activate your account to see this content. See this link to read how you can remove this limitation:

http://forum.civilea.com/thread-27464.html
***************************************


[Image: mirror.png]
Code:
***************************************
Content of this section is hidden, You must be registered and activate your account to see this content. See this link to read how you can remove this limitation:

http://forum.civilea.com/thread-27464.html
***************************************


[Image: password.png]
Code:
***************************************
Content of this section is hidden, You must be registered and activate your account to see this content. See this link to read how you can remove this limitation:

http://forum.civilea.com/thread-27464.html
***************************************



This post has been made by CivilEA Post-Generator V2.4.2
CSA W59.2:24 Welded aluminum construction

| Size: 40.16 MB| Format: PDF| Quality: Scanner| Year: 2024| pages: 193


[Image: 56549441749687188665.jpg]


[Image: info.png]

This is the third edition of CSA W59.2, Welded aluminum construction. It supersedes the previous editions published in 2018 and 1991 and CSA 5244-1969, Welded Design and Workmanship (Inert Gas Shielded Arc Processes), which was replaced by the 1991 edition.

This edition represents the continuous improvement of the Standard in both format and content. The following are the major changes to this edition:

a) Clause 5 includes clarification of weld acceptance criteria for cyclically loaded structures; and

b) Clause 8 has been updated to provide additional clarification related to radiographic inspection of welds.

This Standard was prepared by the Technical Committee on Welding of Bridges, Buildings, and Machinery and the Offshore Welding Task Group, under the jurisdiction of the Strategic Steering Committee on Construction and Civil Infrastructure, and has been formally approved by the Technical Committee.

[Image: download.png]
Code:
***************************************
Content of this section is hidden, You must be registered and activate your account to see this content. See this link to read how you can remove this limitation:

http://forum.civilea.com/thread-27464.html
***************************************


[Image: mirror.png]
Code:
***************************************
Content of this section is hidden, You must be registered and activate your account to see this content. See this link to read how you can remove this limitation:

http://forum.civilea.com/thread-27464.html
***************************************


[Image: password.png]
Code:
***************************************
Content of this section is hidden, You must be registered and activate your account to see this content. See this link to read how you can remove this limitation:

http://forum.civilea.com/thread-27464.html
***************************************



This post has been made by CivilEA Post-Generator V2.4.2