Civil Engineering Association

Full Version: Optimal Timing of Pavement Preventive Maintenance Treatment Applications
You're currently viewing a stripped down version of our content. View the full version with proper formatting.
Optimal Timing of Pavement Preventive Maintenance Treatment Applications

Author: Peshkin, D G Hoerner, T E Zimmerman, K A | Size: 967 KB | Format: PDF | Quality: Original preprint | Publisher: Transportation Research Board | Year: 2004 | pages: 84 | ISBN: 0309088119

[Image: 73071270240957858833.png]


[Image: info.png]

This report describes a methodology for determining the optimal timing for the application of preventive maintenance treatments to flexible and rigid pavements. The methodology is also presented in the form of a macro-driven Microsoft (registered trademark) Excel Visual Basic Application--designated OPTime--available to users by accessing the National Cooperative Highway Research Program (NCHRP) website (http://trb.org/news/blurb_detail.asp?id=4306). The methodology is based on the analysis of performance and cost data and applies to any of the treatments and application methods that are used by highway agencies. A plan for constructing and monitoring experimental test sections is also provided to assist highway agencies in collecting the necessary data if such data are not readily available. The report is a useful resource for state and local highway agency personnel and others involved in pavement maintenance and preservation.

[Image: download.png]
Code:
***************************************
Content of this section is hidden, You must be registered and activate your account to see this content. See this link to read how you can remove this limitation:

http://forum.civilea.com/thread-27464.html
***************************************