12-03-2011, 04:49 PM
Dear member, who have this course, please share. It must be very helpful.
Author(s) / Developer: S. K. Ghosh and Susan Dowty
Description: This one-day seminar was presented by Dr. S. K. Ghosh and Susan Dowty, S.E., in Southern California in July, 2009, and was professionally recorded at the site. The seminar addresses the top 10 misunderstood structural provisions in ASCE 7-05 and related IBC structural provisions. The following ten topics are discussed, including a presentation of answers to questions that we have received on the
application of related provisions:
1. Redundancy Factor
2. Drift Determination and Building Separation
3. Minimum Seismic Design Base Shear
4. Live Load Reduction
5. Seismic Analysis Procedure Selection
6. Enclosure Classification for Wind Design
7. Special Seismic Load Combinations
8. R, Cd and Overstrength Factor Values for Horizontal and Vertical Combinations
9. Seismic and Wind Design of Parapets
10. Torsion, Torsional Irregularity and Direction of Seismic Loading
Total Duration: 6 hrs
PDH Earned: 6
For more information
For sample tutorial, please visit
Author(s) / Developer: S. K. Ghosh and Susan Dowty
Description: This one-day seminar was presented by Dr. S. K. Ghosh and Susan Dowty, S.E., in Southern California in July, 2009, and was professionally recorded at the site. The seminar addresses the top 10 misunderstood structural provisions in ASCE 7-05 and related IBC structural provisions. The following ten topics are discussed, including a presentation of answers to questions that we have received on the
application of related provisions:
1. Redundancy Factor
2. Drift Determination and Building Separation
3. Minimum Seismic Design Base Shear
4. Live Load Reduction
5. Seismic Analysis Procedure Selection
6. Enclosure Classification for Wind Design
7. Special Seismic Load Combinations
8. R, Cd and Overstrength Factor Values for Horizontal and Vertical Combinations
9. Seismic and Wind Design of Parapets
10. Torsion, Torsional Irregularity and Direction of Seismic Loading
Total Duration: 6 hrs
PDH Earned: 6
For more information
Code:
***************************************
Content of this section is hidden, You must be registered and activate your account to see this content. See this link to read how you can remove this limitation:
http://forum.civilea.com/thread-27464.html
***************************************
For sample tutorial, please visit
Code:
***************************************
Content of this section is hidden, You must be registered and activate your account to see this content. See this link to read how you can remove this limitation:
http://forum.civilea.com/thread-27464.html
***************************************