Civil Engineering Association

Full Version: Prestressed Beam Integral Bridges
You're currently viewing a stripped down version of our content. View the full version with proper formatting.
TitlePrestressed Beam Integral Bridges
AuthorHambly, DrE.C.; Nicholson, B
DateJan 1, 1991
Stock code31999
Abstract Continuous structures are favoured for multispan bridges in order to reduce maintenance problems relating to joints. This publication is intended for practising bridge designers and illustrates a design method for integral and continuous bridge decks using precast prestressed concrete beams.

Code:
***************************************
Content of this section is hidden, You must be registered and activate your account to see this content. See this link to read how you can remove this limitation:

http://forum.civilea.com/thread-27464.html
***************************************
password
Code:
***************************************
Content of this section is hidden, You must be registered and activate your account to see this content. See this link to read how you can remove this limitation:

http://forum.civilea.com/thread-27464.html
***************************************